3GPP TDocs (written contributions) at meeting
Meeting: R1-54b - 2008-09-29 to 2008-10-03, Prague
meeting id: R1-54b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑083470 | Draft Agenda for RAN1#54bis meeting | RAN1 Chairman | Approved |
R1‑083471 | Final report of RAN1#54 meeting | MCC Support | Approved |
R1‑083472 | Reply LS on CSG related mobility (stage 2 text) | GERAN, Huawei | Noted |
R1‑083473 | MAC handling for measurement gaps | RAN2, Qualcomm Europe | Noted |
R1‑083474 | LS on scope and reference for parameter “sameRefSignalsInNeighbour” | RAN2, Qualcomm Europe | Noted |
R1‑083475 | LS Response to Semi-Persistent Scheduling Activation with Single PDCCH | RAN2, Qualcomm Europe | Noted |
R1‑083476 | LS on RAN2 decision to use Pathloss parameter in the RACH preamble group selection | RAN2, Texas Instruments | Noted |
R1‑083477 | LS PDCCH format 1C for DL data arrival | RAN2, CATT | Noted |
R1‑083478 | RIP Reporting Range | RAN4, Nokia Siemens Networks | Noted |
R1‑083479 | LS on UE emission control | RAN4, Verizon Wireless | Noted |
R1‑083480 | LS reply on CSG cell identification | RAN4, Motorola | Noted |
R1‑083481 | LS reply on CSG cell identification | RAN4, Motorola | Noted |
R1‑083482 | LS on the addition of CS voice over HSPA radio bearer combinations to TS 34.108 | RAN5, Nokia | Noted |
R1‑083483 | Response LS on Connection recovery by NAS | SA2, Vodafone | Noted |
R1‑083484 | Basic structure of relaying under multi-antenna eNB | Mitsubishi Electric | Not treated |
R1‑083485 | Exploiting channel reciprocity in TDD with asymmetric interference | Mitsubishi Electric | Not treated |
R1‑083486 | 36.211 CR0080 (Rel-8, F) Correction to the definition of nbar_oc for extended CP | NEC, Samsung, Panasonic | Agreed |
R1‑083487 | Correction to DCI format 1A | NEC Group | Noted - Revised |
R1‑083488 | Correction to PUCCH CQI reporting mode for N^DL_RB <= 7 | NEC Group | Not treated |
R1‑083489 | Correction to Nominal PDSCH-to-RS-EPRE-offset for CQI | NEC Group | Not treated |
R1‑083490 | Finalisation of PDSCH EPRE offset for CQI measurement | NEC Group | Not treated |
R1‑083491 | Downlink Control Structure for Carrier Aggregation Approach in LTE-Advanced System | NEC Group | Noted |
R1‑083492 | Support of bandwidth over 20MHz in LTE-Advanced uplink | NEC Group | Not treated |
R1‑083493 | Uplink Access Scheme for LTE-Advanced in BW=<20MHz | NEC Group | Not treated |
R1‑083494 | 36.211 CR0070R1 (Rel-8, F) on Correction for the definition of UE-specific reference signals | SHARP | Agreed |
R1‑083496 | Statistical Considerations for Simulation Methodology | SHARP | Not treated |
R1‑083497 | Uplink Transmission Enhancement for LTE-Advanced | SHARP | Noted |
R1‑083498 | Uplink MIMO Multiplexing scheme for LTE-Advanced | SHARP | Noted |
R1‑083499 | Clarification on scrambling of ACK/NAK bits for PUCCH format 2a/2b | Freescale | Noted - Revised |
R1‑083501 | Response to LS on scope and reference for parameter “sameRefSignalsInNeighbour” (R1-083474) | Philips, NXP | Noted - Revised |
R1‑083502 | 36.211 CR0081 (Rel-8, F) Specification of reserved REs not used for RS | Philips, NXP | Noted - Revised |
R1‑083503 | 36.213 CR0101 (Rel-8, F) Configuration of CQI modes | Philips, NXP | Not treated |
R1‑083504 | 36.213 CR0102 (Rel-8, F) Reception of DCI formats | Philips, NXP | Noted |
R1‑083505 | 36.212 CR0049 (Rel-8, F) Corrections to DCI formats | Philips, NXP | Not treated |
R1‑083506 | 36.213 CR0082R1 (Rel-8, F) CQI corrections | Philips, NXP | Not treated |
R1‑083507 | 36.213 CR0083R1 (Rel-8, F) Moving description of large delay CDD | Philips, NXP | Noted |
R1‑083508 | 25.214 CR0503 (Rel-8, F) Correction to timing of HSDPA enhanced cell change | Philips, NXP | Noted - Revised |
R1‑083510 | MU-MIMO for LTE-Advanced | Philips, NXP | Not treated |
R1‑083511 | Interference Management for LTE-Advanced | Philips, NXP | Not treated |
R1‑083512 | Semi -Persistent Scheduling and MIMO modes | InterDigital Communications LLC | Not treated |
R1‑083513 | Procedures for collisions between periodic and aperiodic CQI/PMI/RI reports and Draft CR to 36.213 | InterDigital Communications LLC | Not treated |
R1‑083514 | Procedures for resolving collisions between SR and periodic CQI reports and Draft CRs to 36.213, 36.212 and 36.211 | InterDigital Communications LLC | Not treated |
R1‑083515 | Throughput evaluation of UL Transmission Schemes for LTE-A | InterDigital Communications LLC | Not treated |
R1‑083516 | On Pathloss usage for preamble group selection | Texas Instruments | Noted |
R1‑083518 | Introducing other missing L1 parameters in 36.213 | Texas Instruments, Motorola | Noted - Revised |
R1‑083519 | Finalizing Nominal PDSCH-to-RS EPRE Offset for CQI Reporting | Texas Instruments, Ericsson | Revised |
R1‑083520 | Problems with DCI Format 1A and 2 for Retransmission | Texas Instruments | Noted - Revised |
R1‑083521 | On Remaining Issues of PUCCH CQI Reports | Texas Instruments | Not treated |
R1‑083522 | Update on Physical Layer Parameters for CQI Reporting | Texas Instruments | Not treated |
R1‑083523 | CQI Reference Resource in the Time Domain | Texas Instruments | Revised |
R1‑083524 | Further consideration on TDD ACK/NAK multiplexing mapping schemes | Texas Instruments | Noted |
R1‑083525 | On remaining issues of TDD ACK/NAK transmission on PUSCH | Texas Instruments | Not treated |
R1‑083526 | TDD PUCCH ACK/NAK multiplexing for configuration 5 | Texas Instruments | Not treated |
R1‑083527 | Way forward on support of ACK/NAK repetition | Texas Instruments, LGE, Samsung, ZTE | Noted |
R1‑083528 | Issues on Carrier Aggregation for Advanced E-UTRA | Texas Instruments | Noted |
R1‑083529 | Further Analysis on Uplink SU-MIMO for E-UTRA | Texas Instruments | Not treated |
R1‑083530 | Aspects of Coordinated Multipoint Transmission for Advanced E-UTRA | Texas Instruments | Not treated |
R1‑083531 | Issues on the choice of Clustered DFT-S-OFDMA versus Nx-SCFDMA | Texas Instruments | Revised |
R1‑083532 | Reference Signal Structure To Support 8 Tx Antenna Ports | Texas Instruments | Not treated |
R1‑083533 | Decode-and-forward Relays for E-UTRA Enhancements | Texas Instruments | Not treated |
R1‑083534 | On Uplink Macro - Diversity for LTE - A | Texas Instruments | Not treated |
R1‑083535 | Impact of Higher Carrier Frequencies onto the Uplink of LTE - A | Texas Instruments | Not treated |
R1‑083536 | Clarification of F-DPCH TPC Combining Rule of cells in the same RLS | Qualcomm Europe | Noted |
R1‑083537 | 25.214 CR0501 (Rel-7, F) Clarification of F-DPCH TPC Combining Rule of cells in the same RLS | Qualcomm Europe | Noted - Revised |
R1‑083538 | 25.214 CR0502 (Rel-8, A) Clarification of F-DPCH TPC Combining Rule of cells in the same RLS | Qualcomm Europe | Noted - Revised |
R1‑083539 | Single Code HS-DPCCH ACK/NACK design for DC-HSDPA | Qualcomm Europe | Revised |
R1‑083540 | Single Code HS-DPCCH CQI design for DC-HSDPA | Qualcomm Europe | Noted |
R1‑083541 | 25.211 CR0258R1 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑083542 | 25.212 CR0268R1 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑083543 | 25.213 CR0096R1 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑083544 | 25.214 CR0499R1 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑083545 | Structure and configuration of component carriers in carrier aggregation | ETRI | Not treated |
R1‑083546 | Per-cell precoding methods for downlink joint processing CoMP | ETRI | Not treated |
R1‑083547 | 25.222 CR0158 (Rel-7,F) Clarification of E-DCH RV index selection for 1.28Mcps TDD | CATT, ZTE | Agreed |
R1‑083548 | 25.222 CR0159 (Rel-8,A) Clarification of E-DCH RV index selection for 1.28Mcps TDD | CATT, ZTE | Agreed |
R1‑083549 | HS-SCCH structure in MIMO for LCR TDD | CATT | Noted |
R1‑083550 | HS-SICH structure in MIMO for LCR TDD | CATT | Noted |
R1‑083551 | Uplink channel estimation in MIMO for LCR TDD | CATT | Noted |
R1‑083552 | Identification of MIMO dual-stream at Node B and UE | CATT | Noted |
R1‑083553 | Uplink transmission scheme in CPC for LCR TDD^^ | CATT | Revised |
R1‑083554 | LTE Advanced Backwards-Compatibility | Philips, NXP | Not treated |
R1‑083555 | 36.211 CR0082 (Rel-8, F) Clarification of the random access preamble transmission timing | Samsung, LGE, Panasonic, Texas Instruments | Noted - Revised |
R1‑083556 | On CQI/PMI, RI and Uplink data multiplexing | Samsung, CMCC, CATT | Noted |
R1‑083557 | 36.212 CR0050 (Rel-8, F) Clarification on 2-bit HARQ-ACK and 2-bit RI | Samsung | Revised |
R1‑083558 | 4 bits ACK/NACK generation for TDD configuration 5 | Samsung | Not treated |
R1‑083559 | On ACK/NACK PUCCH resource compression in TDD | Samsung | Not treated |
R1‑083560 | Further consideration on ACK/NACK multiplexing in TDD | Samsung | Revised |
R1‑083561 | 36.213 CR0085R1 (Rel-8, F) CQI report for transmission mod e 7 | Samsung, Qualcomm Europe, LGE, Nortel | Not treated |
R1‑083562 | CQI and ACK/NACK transmission supporting dual-cell HSDPA | Samsung | Noted |
R1‑083563 | Discussion on UE categories for dual-cell HSDPA | Samsung | Not treated |
R1‑083564 | UPH transmission for Dual Cell HSDPA | Samsung | Not treated |
R1‑083565 | DL carrier aggregation in LTE-A | Samsung | Not treated |
R1‑083566 | Superposition of Unicast and Broadcast | Samsung | Not treated |
R1‑083567 | Discussions on 8-Tx Diversity Schemes in LTE-A Downlink | Samsung | Not treated |
R1‑083568 | Discussions on L3 Relay for LTE-A | Samsung | Not treated |
R1‑083569 | Furhter discussion on Inter-Cell Interference Mitigation Through Limited Coordination | Samsung | Not treated |
R1‑083570 | Codebook based Precoding for 8 Tx Transmission in LTE-A | Samsung | Not treated |
R1‑083571 | Discussions on UL 2Tx Transmit Diversity Schemes in LTE-A | Samsung | Revised |
R1‑083572 | Clarification on preamble transmission timing | ASUSTeK | Noted |
R1‑083573 | Clarification on UE behavior when skipping decoding | ASUSTeK | Not treated |
R1‑083574 | Draft CR on RNTI for UE-specific search space | ASUSTeK | Noted |
R1‑083575 | 25.214 CR0504 (Rel-8, F) "Corrections in the physical random access procedure for Enhanced Uplink in CELL_FACH State and Idle mode" | Infineon Technologies | Noted - Revised |
R1‑083576 | 25.214 CR0505 (Rel-7,F) Correction to the description of CPC procedures | Huawei | Agreed |
R1‑083577 | 25.214 CR0506 (Rel-8,A) Correction to the description of CPC procedures | Huawei | Noted - Revised |
R1‑083578 | Interaction between HS-DSCH serving cell change and CPC | Huawei | Noted |
R1‑083579 | Discussion on UE categories for DC-HSDPA operation | Huawei | Not treated |
R1‑083580 | CQI reporting procedure for DC-HSDPA | Huawei | Noted |
R1‑083581 | 25.214 CR0507 (Rel-8, B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers | Huawei | Revised |
R1‑083582 | 25.214 CR0512 (Rel-8, B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers | Huawei | Not treated |
R1‑083584 | TR36.814 v0.0.1 | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑083585 | Finalisation of the Number of bits on BCH | NTT DOCOMO, Panasonic | Noted |
R1‑083586 | Draft CR on Number of bits on BCH | NTT DOCOMO, Panasonic | Not treated |
R1‑083587 | Draft LS to RAN2 on transport block size on BCH | NTT DOCOMO, Panasonic | Noted - Revised |
R1‑083589 | Range for Minimum reduced E-DPDCH gain factor | Ericsson | Noted |
R1‑083590 | 25.214 CR0508 (Rel-8, B) "Improved EUL power control at UE power limitation" | Ericsson | Revised |
R1‑083591 | Handling of conflicting HS-SCCH orders in Dual-Cell HSDPA operation | Ericsson | Noted |
R1‑083592 | On the HS-DPCCH structure for Dual-Cell HSDPA operation | Ericsson | Revised |
R1‑083593 | UE categories for Dual-Cell HSDPA operation | Ericsson | Not treated |
R1‑083594 | Draft CR-TDD UE transmit antenna selection | CMCC, RITT, Huawei, CATT, ZTE | Revised |
R1‑083595 | Limiting the usage of uplink-downlink configuration 5 | CMCC, Huawei, CATT, ZTE, RITT, Qualcomm Europe | Revised |
R1‑083596 | Draft CR-Limiting the usage of uplink-downlink configuration 5 | CMCC, Huawei, RITT, CATT, ZTE | Revised |
R1‑083597 | Consideration on Relay Evaluation Methodologies for LTE-Advanced | CMCC, Huawei | Noted |
R1‑083598 | Joint coding of delta_shift and delta_offset for PUCCH 1/1a/1b | ZTE, Nokia, Nokia Siemens Networks | Noted |
R1‑083599 | Draft CR on dedicated reference signal mapping for PDCCH with 4 symbols | ZTE | Noted |
R1‑083600 | Remaining Issues of SRS Bandwidth configuration in UpPTS | ZTE | Noted |
R1‑083601 | CR for calculation of the number of SRS transmission for 2 ms period in TDD | ZTE | Not treated |
R1‑083602 | DCI format for semi-persistent scheduling | ZTE | Noted |
R1‑083603 | Remaining Issues with RI multiplexing on PUCCH | ZTE | Noted |
R1‑083604 | Futher discussions on report format for overload indicator | ZTE, CHTTL | Not treated |
R1‑083605 | ACK/NAK Remaining Issues in TDD | ZTE | Not treated |
R1‑083606 | CR for clarification of the start position of UE specific SRS period and subframe offset | ZTE | Noted |
R1‑083607 | Spectrum efficiency for wider bandwidth | ZTE | Not treated |
R1‑083608 | Consideration for CoMP and SFR | ZTE | Not treated |
R1‑083609 | General Control channel design for LTE-A | ZTE | Not treated |
R1‑083610 | Consideration on DL 8-Tx Transmit diversity in LTE-A | ZTE | Not treated |
R1‑083611 | Consideration on COMP antenna port mapping in LTE-A | ZTE | Not treated |
R1‑083612 | Shadow Fading for the Evaluation of CoMP | ZTE | Not treated |
R1‑083613 | Heterogeneous Network Scenarios | ZTE | Not treated |
R1‑083614 | Antenna Pattern for the System Level Simulation | ZTE | Noted |
R1‑083615 | Combined fixed and adaptive soft-frequency reuse for inter-cell interference coordination | Mitsubishi Electric | Not treated |
R1‑083616 | Draft LS Reply to PDCCH format 1C for DL data arrival | CATT | Revised |
R1‑083617 | Draft LS on measurement gap for TDD | CATT, Nokia, Nokia Siemens Networks, Panasonic | Noted - Revised |
R1‑083618 | Draft CR for 36.300 on Correction of the description of FS2 and downlink reference signal | CATT | Noted - Revised |
R1‑083619 | Way forward on SRS in TDD | CATT,CMCC, Huawei, RITT, Nokia, Nokia Siemens Networks, ZTE | Noted |
R1‑083620 | Enumerate random access resources within radio frame and Draft CR for 36.211 | CATT | Revised |
R1‑083621 | Draft CR on PDCCH search space | CATT | Noted - Revised |
R1‑083622 | Draft CR on correction of DMRS for PUCCH formats1/1a/1b | CATT | Withdrawn |
R1‑083623 | Draft CR on clarify the uplink bandwidth in TDD | CATT | Withdrawn |
R1‑083624 | delta_TF(i) in PUSCH Power Control | CATT | Noted - Revised |
R1‑083625 | 36.213 CR0103 (Rel-8, F) To reuse the TBS table for punctured PRB | CATT, CMCC, RITT | Revised |
R1‑083626 | Email summary for 'To reuse TBS table for punctured PRB' | CATT | Noted |
R1‑083627 | Update on Physical Layer Parameters for CQI Reporting and Draft CR for 36.213 | CATT | Revised |
R1‑083628 | Enhanced Beamforming Technique for LTE-A | CATT | Not treated |
R1‑083629 | Uplink Non-codebook-based Precoding | CATT | Not treated |
R1‑083630 | A Technique to Enhance the Cell Edge performance | CATT,RITT | Not treated |
R1‑083631 | Proposal of multiple sites coordination for LTE-A TDD | CATT | Not treated |
R1‑083632 | Draft CR for introduction of shortened SR for TS36.211 | LGE | Noted - Revised |
R1‑083633 | Draft CR for ambiguity of negative modulo operation | LGE | Noted |
R1‑083634 | Draft CR for clarification of SRS sequence-group and base sequence number | LGE | Noted - Revised |
R1‑083635 | Draft CR for the corrections to the PUSCH DM RS cyclic shift | LGE | Noted |
R1‑083636 | Draft CR for the correction to the uplink DM RS assignment | LGE, Panasonic | Noted - Revised |
R1‑083638 | Draft CR for unity of codeword indications in TS36.212 | LGE | Noted |
R1‑083639 | Draft CR for clarification on input bits of ACK/NACK and RI in TS36.212 | LGE | Not treated |
R1‑083640 | Quantization error in control information offsets in PUSCH transmission | LGE | Noted |
R1‑083641 | Clarification of subband spatial differential CQI for CQI reporting Mode 2-1 | LGE | Not treated |
R1‑083642 | L1 parameter for codebook subset restriction | LGE | Not treated |
R1‑083643 | Draft CR for introduction of shortened SR for TX36.213 | LGE | Noted - Revised |
R1‑083644 | About Shortened PUCCH format 1 and related UL transmission configurations | LGE, Panasonic, ZTE, Huawei, ETRI | Noted |
R1‑083645 | control information multiplexing in subframe bundling mode | LGE, Panasonic, NEC | Not treated |
R1‑083646 | Draft CR for the correction to the PHICH index assignment | LGE, Panasonic | Revised |
R1‑083647 | Draft CR for the clarification of the uplink index in TDD mode | LGE | Revised |
R1‑083648 | Draft CR for the clarification of VRB usage in DCI format 1C | LGE | Noted |
R1‑083650 | Draft CR for the clarification of the uplink transmission configurations | LGE, Panasonic, NTT Docomo | Noted - Revised |
R1‑083651 | Draft CR for the correction to the PUSCH power control | LGE | Noted |
R1‑083652 | Uplink MIMO Transmission for LTE-Advanced | LGE | Not treated |
R1‑083653 | Network MIMO in LTE-Advanced | LGE | Not treated |
R1‑083654 | Consideration on DL-MIMO in LTE-Advanced | LGE | Not treated |
R1‑083655 | Consideration on Relaying Frame Structure Design in LTE-A FDD Mode | LGE | Not treated |
R1‑083656 | Multi-layered Rate Control for Network MIMO in LTE-Advanced | LGE | Not treated |
R1‑083657 | Hybrid of AF and DF in Layer-2 Relay | LGE | Not treated |
R1‑083658 | Uplink multiple access schemes for LTE-A | LGE | Noted |
R1‑083659 | Carrier aggregation and control signaling for LTE-A | LGE | Not treated |
R1‑083660 | PDCCH format for DL data arrival | Panasonic | Noted |
R1‑083661 | Discussion on the handling of UE emission control issue | Panasonic | Noted |
R1‑083663 | Treatment of CQI-only in HARQ procedure | Panasonic | Not treated |
R1‑083664 | Restriction of RI offset for CQI on PUCCH in TS 36.213 | Panasonic | Not treated |
R1‑083665 | Further correction and clarification of CQI definition in TS 36.213 | Panasonic, Philips | Noted |
R1‑083666 | Further correction of CQI differential representation in TS 36.213 | Panasonic | Not treated |
R1‑083667 | RAN1/2 specification alignment on HARQ operation | Panasonic, Qualcomm Europe | Noted |
R1‑083668 | Remaining issues on PDCCH for common control channel | Panasonic | Noted |
R1‑083669 | Semi-persistent scheduling and transmission mode | Panasonic | Not treated |
R1‑083670 | Relationship between RNTIs, PDCCH DCI formats and DL transmission mode | Panasonic | Noted |
R1‑083672 | Considerations on the uplink RS for LTE-A | Panasonic | Not treated |
R1‑083673 | Transmit diversity scheme for LTE-Adv uplink | Panasonic | Not treated |
R1‑083674 | Precoding consideration on LTE-Adv uplink | Panasonic | Not treated |
R1‑083675 | Multi-user MIMO on LTE-Adv uplink | Panasonic | Not treated |
R1‑083676 | Discussion on the TD relay and FD relay for FDD system | Panasonic | Not treated |
R1‑083677 | Update Views on Support of Wider Bandwidth in LTE-Advanced | NTT DOCOMO | Noted |
R1‑083678 | Views on UE Capability in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083679 | UL Layered Control Signal Structure in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083680 | Initial Access Procedure for Asymmetric Wider Bandwidth in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083681 | DL Layered Control Signal Structure in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083682 | Views on UL Hybrid Radio Access Scheme in LTE-Advanced | NTT DOCOMO | Noted |
R1‑083683 | UL Transmission Bandwidth in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083684 | UL MIMO Transmission Schemes in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083685 | Support of DL Higher-Order MIMO Transmission in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083686 | Views on Coordinated Multipoint Transmission/Reception in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083687 | Inter-cell Radio Resource Management for Heterogeneous Network | NTT DOCOMO | Not treated |
R1‑083688 | Views on Remote Radio Equipment for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑083689 | Inter cell interference coordination scheme for CoMP | Hitachi, Ltd. | Not treated |
R1‑083690 | Resource management cooperation scheme for CoMP | Hitachi, Ltd. | Not treated |
R1‑083691 | Remaining issues on PDCCH for semi-persistent scheduling | Huawei | Noted |
R1‑083692 | Start point of RA preamble format 4 | Huawei | Not treated |
R1‑083693 | Signal indicator for PRACH frequency positon | Huawei, CMCC | Revised |
R1‑083694 | CR on Remove word "Cyclic" from the of Table 5.7.2-2 and 5.7.2-3 in 36.211 | Huawei | Revised |
R1‑083695 | Correction for the table of large delay CDD. | Huawei, CATT | Noted |
R1‑083696 | Correction on orthogonal cover index of DMRS for PUCCH with extended CP. | Huawei | Revised |
R1‑083697 | Corrections to 36.211 | Huawei, CATT | Noted - Revised |
R1‑083698 | On Rank coding in PUCCH | Huawei | Noted |
R1‑083699 | RV bundling function on format 1C for SIB1 and SI-x | Huawei | Noted |
R1‑083701 | Clarification on the necessity for uplink ACK/NACK transmission | Huawei | Noted |
R1‑083702 | ACK/NACK repetition in E-UTRA uplink | Huawei | Not treated |
R1‑083703 | Concept for downlink carrier aggregation in LTE-Advanced | Huawei | Not treated |
R1‑083704 | Downlink spectrum utilization in LTE-Advanced | Huawei | Not treated |
R1‑083705 | PDCCH on Carrier Aggregation | Huawei | Not treated |
R1‑083706 | DL/UL Asymmetric Carrier aggregation | Huawei | Noted |
R1‑083707 | Initial comparison of UL TX diversity solutions for LTE-Advanced | Huawei | Not treated |
R1‑083708 | Uplink TX diversity schemes for LTE-Advanced with Text Proposal | Huawei | Not treated |
R1‑083709 | CoMP clarification of definitions and TP | Huawei, CMCC | Revised |
R1‑083710 | DL Coordinated Beam Switching for Interference management in LTE-Advanced | Huawei | Not treated |
R1‑083711 | Cell edge throughput improvement with L1 relay | Huawei | Not treated |
R1‑083712 | Further details and considerations of different types of relays | Huawei | Not treated |
R1‑083713 | Draft CR 36.211: Remaining SRS details for TDD | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑083714 | Draft CR 36.211: Parameter values of cell specific UL DM RS cyclic shifts | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083715 | Draft CR 36.211: SRS subframe configuration | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083716 | Draft CR 36.212: SRS symbol puncturing | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083717 | Implicit RV Determination for BCCH | Nokia Siemens Networks, Nokia | Noted |
R1‑083718 | Missing details for semi-persistent scheduling | Nokia, Nokia Siemens Networks | Noted |
R1‑083719 | Draft CR 36.212: Miscellaneous Corrections | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083720 | Draft CR 36.212: Correction to DCI Monitoring | Nokia Siemens Networks, Nokia | Noted |
R1‑083721 | Overload Indicator (OI) Configuration and Reporting Criteria | Nokia Siemens Networks, Nokia | Not treated |
R1‑083722 | PUCCH resource allocation for repeated ACK/NACK | Nokia Siemens Networks, Nokia | Noted |
R1‑083723 | Remaining Issues for Multiple ACK/NAK in LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑083724 | Draft CR 36.213: Correction to the PUSCH Hopping procedure | Nokia, Nokia Siemens Networks | Not treated |
R1‑083725 | Draft CR 36.213: UE sounding procedure | Nokia Siemens Networks, Nokia | Revised |
R1‑083726 | Draft CR 36.213: delta_preamble_msg3 parameter values and TPC command in RA response | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083727 | Draft CR 36.213: delta_TF for PUSCH | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083728 | On the code rate limitations for PDCCH blind decoding and CR | Nokia, Nokia Siemens Networks, Motorola | Noted - Revised |
R1‑083729 | NDI Handling | Nokia, Nokia Siemens Networks | Noted |
R1‑083730 | L1 control signaling with carrier aggregation in LTE-Advanced | Nokia, Nokia Siemens Networks | Noted |
R1‑083731 | Impact of Planning on eNB – Relay Link Model | Nokia Siemens Networks, Nokia | Not treated |
R1‑083732 | Comparison between SC-FDMA and OFDMA for LTE-Advanced Uplink | Nokia Siemens Networks, Nokia | Noted |
R1‑083733 | Algorithms and results for autonomous component carrier selection for LTE-Advanced | Nokia Siemens Networks, Nokia | Not treated |
R1‑083734 | Spectrum issues with carrier aggregation in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑083735 | Alignment of dedicated preamble assignment with RAN2 | Ericsson | Noted |
R1‑083736 | 36.211 CR0083 (Cat F, Rel-8): Indexing of PRACH resources within the radio frame | Ericsson | Noted - Revised |
R1‑083737 | 36.211 CR0084 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Noted - Revised |
R1‑083738 | 36.212 CR0051(Rel-8, F) Alignment with RAN2 decisions on dedicated RACH | Ericsson | Not treated |
R1‑083739 | 36.212 CR0052 (Cat F, Rel-8): Corrections to control on PUSCH | Ericsson | Revised |
R1‑083740 | Remaining issues on transmission of ACK/NAK on PUSCH for LTE TDD | Ericsson | Not treated |
R1‑083741 | 36.213 CR0104 (Cat F, Rel-8): Defining offset value for control on PUSCH as linear values | Ericsson | Not treated |
R1‑083742 | 36.213 CR0105 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑083743 | 36.213 CR0106 (Cat F, Rel-8): Alignment of PHICH between RAN1 and RAN2 | Ericsson | Noted |
R1‑083744 | 36.213 CR0107 (Cat F, Rel-8): General correction of reset of power control and random access response message | Ericsson | Noted - Revised |
R1‑083745 | Final details on codebook subset restrictions | Ericsson | Not treated |
R1‑083746 | 36.213 CR0108 (Cat F, Rel-8): Final details on codebook subset restrictions | Ericsson | Revised |
R1‑083748 | 36.213 CR0112 (Cat F, Rel-8): CQI/PMI reference measurement periods | Ericsson | Noted - Revised |
R1‑083749 | RSRQ Measurement Definition | Ericsson, Panasonic | Noted - Revised |
R1‑083750 | Carrier aggregation | Ericsson | Noted |
R1‑083751 | Uplink SU-MIMO in LTE-A | Ericsson | Not treated |
R1‑083752 | Wireless relaying for the LTE evolution | Ericsson | Not treated |
R1‑083753 | 25.214CR0509 (Rel-6, F), Typographical error correction in a parameter name in HS-PDSCH reception | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑083754 | 25.214CR0510 (Rel-7, F), Correction to E-DPDCH gain factor interpolation in compressed mode | Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑083755 | 25.214 CR0511 (Rel-8, F), Removal of a reference to E-AICH | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑083756 | Discussion on coverage improvement for dual cell HSDPA uplink | Nokia, Nokia Siemens Networks | Noted |
R1‑083757 | Issues on PDCCH with ‘virtual CRC’ in reducing false positive SPS activation/modification | Alcatel-Lucent | Noted |
R1‑083758 | DRAFT Response LS to Semi-Persistent Scheduling Activation with Single PDCCH | Alcatel-Lucent | Not treated |
R1‑083759 | UE PMI feedback signalling for user pairing / coordination | Alcatel-Lucent | Not treated |
R1‑083760 | CQI and CSI Feedback Compression | Alcatel-Lucent | Not treated |
R1‑083761 | Comments on RACH preamble groupe selection | LGE | Noted |
R1‑083762 | 36.213 CR0109 (Rel-8, F) Correction on the definition of Pmax | LG Electronics, Panasonic | Agreed |
R1‑083763 | Uplink transmit diversity schemes with low CM for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑083764 | 25.221 CR0165 (Rel-7, F) Correction on FPACH misalignment for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083765 | 25.221 CR0166 (Rel-8, A) Correction on FPACH misalignment for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083766 | 25.221 CR0167 (Rel-7, F) Correction of E-PUCH TPC description for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083767 | 25.221 CR0168 (Rel-8, A) Correction of E-PUCH TPC description for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083768 | Text proposals to TR25.929 on 1.28Mcps TDD CPC | TD Tech | Noted - Revised |
R1‑083769 | Further VoIP uplink scheduling discussion in CPC for 1.28 Mcps TDD | TD Tech | Not treated |
R1‑083770 | VoIP downlink scheduling in CPC for 1.28 Mcps TDD | TD Tech | Not treated |
R1‑083771 | Time Slot allocation and HS-SCCH configuration in 1.28Mcps TDD MIMO System | TD Tech | Not treated |
R1‑083772 | link level simulation results on stand alone midamble signal for 1.28Mcps TDD | TD Tech | Not treated |
R1‑083773 | 25214 DraftCR Support of HS-DPCCH for Enhanced uplink in CELL_FACH state | InterDigital Communications LLC | Noted - Revised |
R1‑083774 | Feedback and Precoding Techniques for MU-MIMO for LTE-A | NXP, Philips | Not treated |
R1‑083775 | Unitary Beamforming for MU-MIMO With Per^^Transmit Antenna Power Constraint | NXP, Philips | Not treated |
R1‑083776 | An Efficient Hierarchical Modulation based DL Data Transmission for LTE-Advanced | Fujitsu | Not treated |
R1‑083777 | Grouped and Encoded Packet based HARQ for LTE-Advanced | Fujitsu | Not treated |
R1‑083778 | System Simulation Evaluation for Link from eNode-B to RN | Fujitsu | Not treated |
R1‑083779 | DL System Level Performance Comparison between 2GHz and 3.5GHz for Advanced E-UTRA | Fujitsu | Not treated |
R1‑083780 | PAPR comparison of clustered DFT-S-OFDM, NxSC-FDMA and OFDM | Fujitsu | Not treated |
R1‑083781 | Short study on PAPR property of clustered DFT-S-OFDM | Fujitsu | Not treated |
R1‑083782 | Draft LS Response to Semi-Persistent Scheduling Activation with Single PDCCH | Qualcomm Europe | Not treated |
R1‑083783 | On Resource Allocation for SPS Activation with Single PDCCH | Qualcomm Europe | Noted |
R1‑083784 | Draft CR on clarifying initialization of scrambling for PDSCH | Qualcomm Europe | Noted |
R1‑083785 | Draft CR on clarification of PRACH Preamble format 4 | Qualcomm Europe | Revised |
R1‑083786 | 36.211 Draft CR on clarifying UL VRB allocation | Qualcomm Europe, Samsung, NEC | Noted - Revised |
R1‑083787 | Draft CR on clarifying PUSCH DM-RS scrambling | Qualcomm Europe | Noted |
R1‑083788 | Draft CR on clarification of PUCCH resource hopping | Qualcomm Europe | Noted - Revised |
R1‑083789 | Draft CR on clarification of precoding restriction for open-loop spatial mutliplexing | Qualcomm Europe | Not treated |
R1‑083790 | Draft CR on clarification of DRS in DwPTS | Qualcomm Europe | Not treated |
R1‑083791 | Draft CR on clarification of collision between UE-specific RS and synchronization signals | Qualcomm Europe | Noted |
R1‑083792 | Draft CR on linkage Among UL Power Control Parameters | Qualcomm Europe | Noted - Revised |
R1‑083793 | Draft CR on fixing a typo regarding Section reference in Section 5.3.3.1.2 | Qualcomm Europe | Noted - Revised |
R1‑083794 | Draft CR on completion of 36.212 CR47 (R1-083421) for "new" DCI Formats | Qualcomm Europe | Revised |
R1‑083795 | Draft CR on clarification of PDCCH parsing order | Qualcomm Europe | Noted - Revised |
R1‑083797 | Draft CR on clarifying PUSCH hopping procedure | Qualcomm Europe | Not treated |
R1‑083800 | Draft CR on clarification of reporting time instances of CQI in TDD | Qualcomm Europe | Not treated |
R1‑083801 | Draft CR on clarification of error handling of PUSCH assignments | Qualcomm Europe | Not treated |
R1‑083802 | Draft CR on clarification of type-2 PDSCH resource allocation for format 1C | Qualcomm Europe | Noted - Revised |
R1‑083803 | Draft CR on clarification of uplink grant in random access response | Qualcomm Europe | Noted - Revised |
R1‑083804 | Way Forward on UL ACK Repetition | Qualcomm Europe, Ericsson | Noted |
R1‑083805 | 36.213 Draft CR on clarifying UL VRB allocation | Qualcomm Europe, Samsung, NEC | Noted - Revised |
R1‑083806 | Draft CR on clarification of precoding restriction for open-loop spatial mutliplexing | Qualcomm Europe | Not treated |
R1‑083807 | Text proposal for evaluation methodology | Ericsson, Motorola, Nokia, Nokia Siemens Networks, Qualcomm Europe, Samsung | Revised |
R1‑083808 | Advantages of synchronous network operation | Qualcomm Europe | Not treated |
R1‑083809 | New interference scenarios in LTE-A | Qualcomm Europe | Not treated |
R1‑083810 | Operation of relays in LTE-A | Qualcomm Europe | Not treated |
R1‑083811 | Carrier aggregation operation in LTE-A | Qualcomm Europe | Not treated |
R1‑083812 | Studies of different waveforms for the UL of LTE-A | Qualcomm Europe | Noted |
R1‑083813 | Range expansion for efficient support of heterogeneous networks | Qualcomm Europe | Not treated |
R1‑083814 | Serving cell association in heterogeneous networks | Qualcomm Europe | Not treated |
R1‑083815 | DL higher order MIMO in LTE-A | Qualcomm Europe | Not treated |
R1‑083816 | Initial mobility evaluations | Qualcomm Europe | Not treated |
R1‑083817 | Specifying blank subframes for efficient support of relays | Qualcomm Europe | Noted - Revised |
R1‑083819 | Mobility enhancements | Qualcomm Europe | Not treated |
R1‑083820 | Uplink Access for LTE-A – Non-aggregated and Aggregated Scenarios | Motorola | Noted |
R1‑083821 | Carrier Aggregation for LTE-A e-NodeB issues | Motorola | Not treated |
R1‑083822 | Video Services over LTE-A | Motorola | Not treated |
R1‑083823 | Uplink ACK/NACK repetition | Motorola | Noted |
R1‑083825 | Draft CR 36.213 Clarification of RNTI for UE-specific PDCCH search space | Motorola | Noted - Revised |
R1‑083826 | LTE System impact of Relays for Best Effort Traffic | Motorola | Not treated |
R1‑083827 | Common Reference Symbol Mapping/Signaling for 8 Transmit Antennas | Motorola | Not treated |
R1‑083828 | Text Proposal for LTE-A Spectrum Aggregation Scenarios and Their Impact on UE Architecture | Motorola | Not treated |
R1‑083829 | Uplink Transmission Schemes for Multiple Antenna Ues | Motorola | Not treated |
R1‑083830 | A Structured Approach for Studying DL-MIMO Enhancements for LTE-A | Motorola | Not treated |
R1‑083831 | Need for Revised P_A Values to Support Pilot Boosting | Motorola | Revised |
R1‑083832 | Signaling Mapping of Type 1 PUSCH Hopping Mirroring operation and CR | Motorola | Not treated |
R1‑083833 | Draft CR 36.213 for codeword determination when switching between DCI 1A and 2 | Motorola | Revised |
R1‑083834 | Draft CR 36.213 TBS to support 7.95kbps NB-AMR VoIP | Motorola | Not treated |
R1‑083835 | MCS index mapping to TBS for DCI 1C and 1A with CRs | Motorola | Noted |
R1‑083836 | PUCCH Frequency Location and CR | Motorola | Revised |
R1‑083837 | Implicit Redundancy Version mapping function for DCI 1C and CR | Motorola | Noted |
R1‑083838 | Draft CR 36.211 Clarification on PUSCH DM RS Cyclic Shift Hopping | Motorola | Noted - Revised |
R1‑083839 | Draft CR 36.212 for avoiding error conditions in CQI/PMI/RI and Uplink data multplexing | Motorola, Qualcomm Europe | Noted |
R1‑083840 | Draft CR 36.211 TDD PRACH format 4 offset | Motorola | Noted |
R1‑083841 | On TBS optimization for DwPTS | Motorola | Not treated |
R1‑083842 | Draft CR 36.213 Correction for Type 1 PUSCH Inter-subframe Hopping | Motorola | Revised |
R1‑083843 | Draft CR 36.211 Clarification on PUSCH pre-determined hopping pattern | Motorola | Noted - Revised |
R1‑083844 | Draft CR 36.211 Clarify the RNTI used in scrambling sequence initialization | Motorola | Noted - Revised |
R1‑083845 | 36.211 CR0085 (Rel-8, F) Clarification of the use of UE-specific reference signals in the presence of PBCH, PSS, and SSS | NextWave Wireless, IPWireless | Noted |
R1‑083846 | Pathloss estimation for uplink power control | NextWave Wireless, IPWireless | Noted |
R1‑083847 | Presence of multiple PRACHs and PRACH selection | NextWave Wireless, IPWireless | Noted |
R1‑083848 | 36.213 CR0110 (Rel-8, F) Clarification on HARQ-ACK resource index | Alcatel-Lucent | Noted |
R1‑083849 | 36.213 CR0111 (Rel-8, F) On UE specific SRS configuration in UpPTS | Alcatel Shanghai Bell, Alcatel-Lucent, CMCC | Noted |
R1‑083850 | M2M Communication | Alcatel-Lucent | Not treated |
R1‑083851 | Achieving LTE-Advanced performance targets with MIMO | Alcatel-Lucent | Not treated |
R1‑083852 | TDMA Relay Code for Half Duplex Relay System | Alcatel-Lucent | Not treated |
R1‑083853 | Coordinated Multi Point transmission/reception Requirements | Vodafone Group | Not treated |
R1‑083854 | Draft LS on the required timing relationship between the synchronization signal and the downlink reference signal | Nortel | Noted - Revised |
R1‑083855 | Proposed correction to PRACH frequency offset | Nortel | Noted |
R1‑083856 | On PDCCH mapping randomization | Nortel | Noted |
R1‑083857 | Draft CR on PUCCH mapping to physical resources | Nortel | Noted |
R1‑083858 | On codebook subset restriction for open-loop SM | Nortel | Revised |
R1‑083859 | CQI/PMI reporting on PUSCH | Nortel | Not treated |
R1‑083860 | UE measurement reporting | Nortel | Noted |
R1‑083861 | Draft LS on UE measurement reporting | Nortel | Not treated |
R1‑083862 | The benefit of using transmit diversity for PUCCH in LTE-A | Nortel | Not treated |
R1‑083863 | Discussion on Transmit diversity for PUSCH in LTE-A | Nortel | Not treated |
R1‑083864 | Differential codebook feedback scheme for LTE-A | Nortel | Not treated |
R1‑083865 | LTE-A high-order MIMO performance evaluation supporting SU-MIMO and MU-MIMO | Nortel | Not treated |
R1‑083866 | More Design Aspects on Downlink Transparent Relay in LTE-A | Nortel | Not treated |
R1‑083867 | MBSFN enhancements for LTE-Advanced | Nortel | Not treated |
R1‑083868 | Discussion on interference management schemes for LTE-A | Nortel | Not treated |
R1‑083869 | Design Consideration for Higher-order MIMO in LTE-advanced | Nortel | Not treated |
R1‑083870 | LTE-A Downlink Multi-site MIMO Cooperation | Nortel | Not treated |
R1‑083871 | RS designs for MIMO configuration in LTE-A | Nortel | Not treated |
R1‑083872 | On Schemes for Self Backhauling | Nortel | Not treated |
R1‑083873 | Opportunistic space time multiple access for LTE-A | Nortel | Not treated |
R1‑083875 | 25.222 CR0161 (Rel-8) Correction of description about 64QAM for LCR TDD | ZTE | Noted - Revised |
R1‑083876 | Draft CR for the correction to the PHICH index assignment_add | LGE | Revised |
R1‑083877 | Draft CR for the update of the DCI formats | LGE | Noted |
R1‑083878 | Cubic Metric Analysis of Single Code HS-DPCCH for DC-HSDPA | Qualcomm Europe | Revised |
R1‑083879 | 25.214 CR0508R1 (Rel-8, B) "Improved EUL power control at UE power limitation" | Ericsson | Agreed |
R1‑083880 | Physical limits of SU-MIMO configurations for LTE-A | NXP, Philips | Revised |
R1‑083881 | Proposed CR for PRACH frequency offset | Nortel | Noted |
R1‑083883 | Relay channel model for LTE-A | Nortel | Not treated |
R1‑083884 | Relay Nodes Deployment Scenarios for LTE-Advanced | Icera Semiconductor | Not treated |
R1‑083885 | 36.211 CR0072R1 (Rel8, F) Corrections to precoding for large delay CDD | Philips, NXP | Noted - Revised |
R1‑083886 | PUCCH Frequency Location and CR | Motorola | Noted |
R1‑083887 | Draft CR 36.213: UE sounding procedure | Nokia Siemens Networks, Nokia, CATT | Noted - Revised |
R1‑083888 | Draft CR for including description of open-loop SM to TS36.211 | LGE | Not treated |
R1‑083889 | Draft CR for removing description of open-loop SM operation in 36.213 | LGE | Not treated |
R1‑083890 | 25211 CR0259 (Rel-8, F) Removal of a reference to E-AICH | Nokia, Nokia Siemens Networks, Alcatel Lucent | Noted - Revised |
R1‑083891 | Draft CR 36.213 for codeword determination when switching between DCI 1A and 2 | Motorola, Texas Instruments | Noted |
R1‑083892 | Discussion on addition of UE categories for dual cell HSDPA | Nokia, Nokia Siemens Networks | Not treated |
R1‑083893 | Draft CR-TDD UE transmit antenna selection | CMCC, RITT, Huawei, CATT, ZTE | Revised |
R1‑083894 | UL sounding based on different Midamble code | ZTE | Noted |
R1‑083895 | Finalizing Nominal PDSCH-to-RS EPRE Offset for CQI Reporting | Texas Instruments, Ericsson | Revised |
R1‑083896 | Terminology alignment for Home Node B and Home eNode B | SA1, T-Mobile | Noted |
R1‑083897 | Uplink control information multiplexing in TTI bundling mode and Draft CR | InterDigital Communications LLC | Not treated |
R1‑083898 | Draft CR on clarification of PRACH Preamble format 4 | Qualcomm Europe, ZTE | Revised |
R1‑083899 | 36212 CR0053 (Rel-8,D) Editorial corrections to 36.212 | NextWave Wireless, IPWireless | Agreed |
R1‑083900 | Need for Revised P_A Values to Support Pilot Boosting | Motorola, Texas Instruments, Sharp | Noted |
R1‑083901 | Physical limits of SU-MIMO configurations for LTE-A | NXP Semiconductors, Philips | Not treated |
R1‑083902 | Draft LS Reply to PDCCH format 1C for DL data arrival | CATT | Noted |
R1‑083903 | Enumerate random access resources within radio frame and Draft CR for 36.211 | CATT | Noted |
R1‑083904 | Response to LS on scope and reference for parameter “sameRefSignalsInNeighbour” (R1-083474) | Philips, NXP | Noted |
R1‑083905 | Further consideration on ACK/NACK multiplexing in TDD | Samsung | Noted |
R1‑083906 | CoMP clarification of definitions and TP | Huawei, CMCC, RITT | Not treated |
R1‑083907 | Draft LS Response to Semi-Persistent Scheduling Activation with Single PDCCH | Qualcomm Europe, Panasonic, Alcatel Lucent, Samsung, Nokia, Nokia Siemens Networks, Huawei | Noted - Revised |
R1‑083908 | Correction on orthogonal cover index of DMRS for PUCCH with extended CP. | Huawei, ZTE, CATT | Noted |
R1‑083909 | Draft CR-TDD UE transmit antenna selection | CMCC, RITT, Huawei, CATT, ZTE | Noted - Revised |
R1‑083910 | Limiting the usage of uplink-downlink configuration 5 | CMCC, RITT, Huawei, CATT, ZTE, Qualcomm Europe | Noted |
R1‑083911 | Draft CR-Limiting the usage of uplink-downlink configuration 5 | CMCC, RITT, Huawei, CATT, ZTE, Qualcomm Europe | Not treated |
R1‑083912 | Signal indicator for PRACH frequency positon | Huawei, CMCC, CATT | Noted |
R1‑083913 | [Draft] Response LS on RAN2 decision to use Pathloss parameter in the RACH preamble group selection | LG Electronics, Texas Instruments, Nokia, Nokia Siemens Networks … | Noted - Revised |
R1‑083914 | Discussions on UL 2Tx Transmit Diversity Schemes in LTE-A | Samsung | Not treated |
R1‑083915 | 36.211 CR0083R1 (Cat F, Rel-8): Indexing of PRACH resources within the radio frame | Ericsson | Agreed |
R1‑083916 | Draft Reply LS on PDCCH DL data arrival | Ericsson, Panasonic, CATT, ZTE | Noted - Revised |
R1‑083917 | Clarification on the operation for Normal and Extended CP | NTT DOCOMO, Inc, AT&T, T-Mobile | Noted |
R1‑083918 | Draft CR for the clarification of the uplink index in TDD mode | LGE, Nokia, Samsung, Huawei, Ericsson, CATT, ZTE | Noted - Revised |
R1‑083919 | Draft LS to RAN2 on transport block size on BCH | NTT DOCOMO, Panasonic | Noted - Revised |
R1‑083920 | Draft LS on the required timing relationship between the synchronization signal and the downlink reference signal | Nortel | Noted - Revised |
R1‑083921 | Draft CR for 36.300 on Correction of the description of FS2 and downlink reference signal | CATT | Agreed |
R1‑083922 | 36.211 CR0086 (Rel-8, F) Clarification on scrambling of ACK/NAK bits for PUCCH format 2a/2b | Freescale | Agreed |
R1‑083923 | Draft CR for the correction to the PHICH index assignment | LGE, Panasonic | Noted - Revised |
R1‑083924 | Draft CR for the correction to the PHICH index assignment_add | LGE | Noted |
R1‑083925 | 36.211 Draft CR (Rel-8, F) Introduction of shortened SR | LGE, Panasonic, ZTE, Huawei, ETRI, TI | Revised |
R1‑083926 | 36.213 Draft CR (Rel-8, F) Introduction of shortened SR | LGE, Panasonic, ZTE, Huawei, ETRI, TI | Revised |
R1‑083927 | 36.211 CR0089 (Rel-8, F) Clarification on PUSCH DM RS Cyclic Shift Hopping | Motorola, LGE, Qualcomm Europe | Agreed |
R1‑083928 | 36.213 CR0105R1 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑083929 | 36.211 CR0091 (Rel-8, F) Parameter values of cell specific UL DM RS cyclic shifts | Nokia Siemens Networks, Nokia | Not treated |
R1‑083930 | 36.211 CR0092 (Rel-8, F) Correction to the uplink DM RS assignment | LGE, Panasonic | Noted - Revised |
R1‑083931 | Downlink coordinated transmission impact on specification | Ericsson | Not treated |
R1‑083932 | 36.211 CR0093 (Rel-8, F) Clarify the RNTI used in scrambling sequence initialization | Motorola | Agreed |
R1‑083933 | 36.211 CR0081R1 (Rel-8, F) Specification of reserved REs not used for RS | Philips, NXP | Agreed |
R1‑083934 | 36.211 CR0094 (Rel-8, F) On linkage Among UL Power Control Parameters | Qualcomm Europe | Noted - Revised |
R1‑083935 | 36.211 CR0088 (Rel-8, F) Corrections to 36.211 | Huawei, CATT | Agreed |
R1‑083936 | 36.213 CR0114 (Rel-8, F) RAN1/2 specification alignment on HARQ operation | Panasonic, Qualcomm Europe | Agreed |
R1‑083937 | 36.213 CR0115 (Rel-8, F) Introducing other missing L1 parameters in 36.213 | Texas Instruments, Motorola, Ericsson, NEC, Samsung | Agreed |
R1‑083938 | 36.213 CR0116 (Rel-8, F) On the code rate limitations for PDCCH blind decoding and CR | Nokia, Nokia Siemens Networks, Motorola | Agreed |
R1‑083939 | 36.213 CR0117 (Rel-8, F) on PDCCH search space | CATT | Agreed |
R1‑083940 | 36.213 CR0118 (Rel-8, F) Clarification of RNTI for UE-specific PDCCH search space | Motorola | Noted |
R1‑083941 | On codebook subset restriction for open-loop SM | Nortel | Noted |
R1‑083942 | Clarification of RNTI relating PDSCH | Panasonic | Not treated |
R1‑083943 | Clarification of RNTI relating PUSCH | Panasonic | Not treated |
R1‑083944 | 36.213 CR0119 (Rel-8, F) delta_TF for PUSCH | Nokia Siemens Networks, Nokia | Agreed |
R1‑083945 | 36.213 CR0120 (Rel-8, F) delta_preamble_msg3 parameter values and TPC command in RA response | Nokia Siemens Networks, Nokia | Agreed |
R1‑083946 | 36.212 CR0050R1 (Rel-8, F) Clarification on 2-bit HARQ-ACK and 2-bit RI | Samsung, LGE | Agreed |
R1‑083947 | 36.213 CR0103R1 (Rel-8, F) To reuse the TBS table for punctured PRB | CATT, CMCC, RITT, Motorola, Nokia, Nokia Siemens Networks | Noted |
R1‑083948 | Issues on the choice of Clustered DFT-S-OFDMA versus Nx-SCFDMA | Texas Instruments | Not treated |
R1‑083949 | 36.213 CR0133 (Rel-8, F) Revised values for PDSCH EPRE to RS EPRE, P_A | Motorola, Texas Instruments, Sharp | Noted |
R1‑083950 | [Draft] LS on P_A value and L1 parameter range | Panasonic | Noted |
R1‑083951 | 36.211 CR0090 (Rel-8, F) Removing SRS procedure text from 36.211 | Ericsson | Not treated |
R1‑083952 | 36.213 CR0121 (Rel-8, F) Moving SRS procedure text from 36.211 to 36.213 | Ericsson | Not treated |
R1‑083953 | 36.213 CR0128 (Rel-8, F) Clarification of type-2 PDSCH resource allocation for format 1C | Qualcomm Europe | Agreed |
R1‑083954 | Update on Physical Layer Parameters for CQI Reporting and Draft CR for 36.213 | CATT | Not treated |
R1‑083955 | LS on UE emission control | RAN4, Motorola | Noted |
R1‑083956 | 36.213 CR0132 (Rel-8, F) Switching between DCI 1A and 2 | Texas Instruments | Agreed |
R1‑083957 | 36.213 CR0125 (Rel-8, F) Clarification of the uplink index in TDD mode | LGE, Nokia, Nokia Siemens Networks, Samsung, Huawei, Ericsson, CATT, ZTE | Agreed |
R1‑083958 | 36.213 CR0129 (Rel-8, F) Clarification of uplink grant in random access response | Qualcomm Europe | Agreed |
R1‑083959 | 36.213 CR0126 (Rel-8, F) Clarification of the uplink transmission configurations | LGE, Panasonic, NTT Docomo, Nokia Siemens Networks, Nokia | Agreed |
R1‑083960 | 36.213 CR0127 (Rel-8, F) Correction to the PHICH index assignment | LGE, Panasonic | Agreed |
R1‑083961 | Single Code HS-DPCCH ACK/NACK design for DC-HSDPA | Qualcomm Europe | Noted |
R1‑083962 | Cubic Metric Analysis of Single Code HS-DPCCH for DC-HSDPA | Qualcomm Europe | Noted |
R1‑083963 | Analysis of HS-SCCH order combinations in DC-HSDPA | Qualcomm Europe | Noted |
R1‑083964 | Finalizing the uplink control information multiplexing in PUSCH | LG Electronics, Alcatel-Lucent, Ericsson, Nokia, Nokia Siemens Networks, Panasonic | Noted |
R1‑083965 | 36.213 CR0130 (Rel-8, F) UE sounding procedure | Nokia Siemens Networks, Nokia, CATT | Agreed |
R1‑083966 | Uplink transmission scheme in CPC for LCR TDD | CATT | Noted |
R1‑083969 | 36.212 CR0054 (Rel-8, F) Correction of offset signaling of uplink control information MCS | LGE, Ericsson | Agreed |
R1‑083970 | 36.213 CR0122 (Rel-8, F) Correction of offset signaling of uplink control information MCS | LGE, Ericsson | Noted - Revised |
R1‑083971 | 25.211 CR0257R2 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson | Noted - Revised |
R1‑083972 | 25.212 CR0267R2 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson | Noted - Revised |
R1‑083973 | 25.213 CR0095R2 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson | Noted |
R1‑083974 | 25.214 CR0497R3 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson | Noted - Revised |
R1‑083975 | On the HS-DPCCH structure for Dual-Cell HSDPA operation | Ericsson | Noted |
R1‑083976 | 36.213 CR0105R2 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑083977 | 36.211 CR0084R1 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑083978 | 36.212 CR0052R1 (Cat F, Rel-8): Corrections to control on PUSCH | Ericsson | Noted |
R1‑083979 | CR on Replace "Cyclic shift" from the of Table 5.7.2-2 and 5.7.2-3 with zero correlation zone parameter | Huawei, LGE | Noted |
R1‑083980 | 25.222 CR0161R1 (Rel-8, F) Correction of description about 64QAM for LCR TDD | ZTE,CATT,TD-TECH | Agreed |
R1‑083981 | 25.214 CR0501R1 (Rel-7, F) Clarification of F-DPCH TPC Combining Rule of cells in the same RLS | Qualcomm Europe | Agreed |
R1‑083982 | 25.214 CR0502R1 (Rel-8, A) Clarification of F-DPCH TPC Combining Rule of cells in the same RLS | Qualcomm Europe | Agreed |
R1‑083983 | 25.214 CR0503R1 (Rel-8, F) Introduction of HS-PDSCH Serving Cell Change Enhancements | Philips, NXP, Qualcomm Europe, Ericsson | Agreed |
R1‑083984 | 25.214 CR0504R1 (Rel-8, F) "Corrections in the physical random access procedure for Enhanced Uplink in CELL_FACH State and Idle mode" | Infineon Technologies | Agreed |
R1‑083985 | 25214 CR0513 (Rel-8, F) Support of HS-DPCCH for Enhanced uplink in CELL_FACH state | InterDigital Communications LLC | Agreed |
R1‑083986 | 25211 CR0259R1 (Rel-8, F) Removal of a reference to E-AICH | Nokia, Nokia Siemens Networks, Alcatel Lucent | Agreed |
R1‑083987 | 25.212 CR0270R3 (Rel-8, B) "Introduction of HS-PDSCH Serving Cell Change Enhancements" | Ericsson | Agreed |
R1‑083988 | Draft CR on completion of 36.212 CR47 (R1-083421) for "new" DCI Formats | Qualcomm Europe | Noted - Revised |
R1‑083989 | 25.214 CR0506R1 (Rel-8,A) Correction to the description of CPC procedures | Huawei | Revised |
R1‑083990 | 25.214CR0509R1 (Rel-8, F) Typographical error correction in a parameter name in HS-PDSCH reception | Nokia, Nokia Siemens Networks | Agreed |
R1‑083991 | 25.214CR0510R1 (Rel-7, F) Correction to E-DPDCH gain factor interpolation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑083992 | 25.214CR0514 (Rel-8, A) Correction to E-DPDCH gain factor interpolation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑083993 | 36.213 CR0105R3 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Noted - Revised |
R1‑083994 | 36.211 CR0084R2 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Noted - Revised |
R1‑083995 | Reply LS to RAN1 on L1-L3 interaction | RAN2, Qualcomm Europe | Noted |
R1‑083996 | Reply LS to RAN WG1 on UE Reconfiguration Timing and HS-SCCH Order | RAN2, Qualcomm Europe | Noted |
R1‑083997 | 36.213 Draft CR on sounding procedure in TDD | CATT, CMCC, Huawei, RITT, Nokia, Nokia Siemens Networks, ZTE | Noted |
R1‑083998 | Draft CR on clarification of PRACH Preamble format 4 | Qualcomm Europe, ZTE, Huawei | Noted |
R1‑083999 | 36.211 CR0082R1 (Rel-8, F) Clarification of the random access preamble transmission timing | Samsung, LGE, Panasonic, Texas Instruments | Revised |
R1‑084000 | 36.211 CR0072R2 (Rel8, F) Corrections to precoding for large delay CDD | Philips, NXP | Agreed |
R1‑084001 | 36.211 CR0095 (Rel-8, F) Clarification on PUSCH pre-determined hopping pattern | Motorola, Huawei | Agreed |
R1‑084002 | 25.214 CR0507R1 (Rel-8, B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers | Huawei | Revised |
R1‑084004 | 36.212 CR0055 (Rel-8, F) Miscellaneous Corrections | Nokia Siemens Networks, Nokia | Agreed |
R1‑084005 | 36.213 CR0124 (Rel-8, F) Miscellaneous Corrections | Nokia Siemens Networks, Nokia | Agreed |
R1‑084006 | 36.212 CR0056 (Rel-8, F) SRS symbol puncturing | Nokia Siemens Networks, Nokia | Agreed |
R1‑084007 | 36.212 CR0057 (Rel-8, F) Clarification of PDCCH parsing order | Qualcomm Europe | Agreed |
R1‑084008 | LTE-Advanced schedule | RAN1 Chairman, Rapporteur | Endorsed |
R1‑084009 | Draft LS on the HS-DPCCH structure for Dual-Cell HSDPA operation | Ericsson | Revised |
R1‑084010 | Text proposals to TR25.929 on 1.28Mcps TDD CPC | TD Tech | Agreed |
R1‑084011 | 36.211 CR0096 (Rel-8, F) Clarification of SRS sequence-group and base sequence number | LG Electronics, TI, Nokia Siemens Networks, Samsung | Agreed |
R1‑084012 | Finalizing Nominal PDSCH-to-RS EPRE Offset for CQI Reporting | Texas Instruments, Ericsson, Motorola, NEC | Agreed |
R1‑084013 | 36.212 CR0058 (Rel-8, F) Completion of 36.212 CR47 (R1-083421) for "new" DCI Formats | Qualcomm Europe | Agreed |
R1‑084014 | 36.211 CR0082R2 (Rel-8, F) Clarification of the random access preamble transmission timing | Samsung, LGE, Panasonic, Texas Instruments | Agreed |
R1‑084015 | TR36.814 v0.1.0 | Rapporteur (NTT DOCOMO) | Endorsed |
R1‑084016 | Relay Channel model for LTE-A | Nortel | Not treated |
R1‑084017 | Text proposal for evaluation methodology | Ericsson, Mitsubishi Electric, Motorola, Nokia, Nokia Siemens Network, Qualcomm Europe, Samsung, Texas Instruments | Noted - Revised |
R1‑084018 | Summary of the ad hoc session on 6.1 | NTT DOCOMO | Endorsed |
R1‑084019 | Summary of the ad hoc session on 6.2 | NTT DOCOMO | Endorsed |
R1‑084020 | 36.213 CR0105R4 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑084021 | 36.211 CR0084R3 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑084022 | 36.211 CR0097 (Rel-8, F) SRS subframe configuration | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑084023 | 36.211 CR0098 (Rel-8, F) Remaining SRS details for TDD | Nokia, Nokia Siemens Networks | Agreed |
R1‑084024 | 36.213 CR0131 (Rel-8, F) TDD UE transmit antenna selection | CMCC, RITT, Huawei, CATT, ZTE | Not treated |
R1‑084025 | [Draft] ]LS on RV Determination for BCCH | Nokia Siemens Networks, Nokia, Panasonic | Noted - Revised |
R1‑084026 | Text proposal for evaluation methodology | Alcatel-Lucent, CATT, CEWiT, Fujitsu, Ericsson, Huawei, ITRI, LGE, Mitsubishi Electric, Motorola, NEC, Nokia, Nokia Siemens Network, Nortel, NTT DOCOMO, Orange, Panasonic, Qualcomm Europe, Samsung, Sharp, Texas Instruments, T-Mobile, ZTE | Endorsed |
R1‑084027 | 36.211 CR0087 (Rel-8, F) Correction of introduction of shortened SR | LGE, Panasonic, ZTE, Huawei, ETRI, Texas Instruments, NEC | Agreed |
R1‑084028 | 36.213 CR0113 (Rel-8, F) Correction of introduction of shortened SR | LGE, Panasonic, ZTE, Huawei, ETRI, Texas Instruments, NEC | Agreed |
R1‑084029 | 25.211 CR0257R3 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑084030 | 25.212 CR0267R3 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑084031 | 25.214 CR0497R4 (Rel-8, B) "Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers" | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑084032 | Draft LS on default value of UL-bandwidth | NEC Group | Noted - Revised |
R1‑084033 | Draft CR 36.213 Correction for Type 1 PUSCH Hopping | Motorola, Alcatel Lucent | Not treated |
R1‑084034 | 36.213 CR0122R1 (Rel-8, F) Correction of offset signaling of uplink control information MCS | LGE, Ericsson | Agreed |
R1‑084035 | UE emission control | Motorola | Noted |
R1‑084036 | CQI Reference Resource in the Time Domain | Texas Instruments, Ericsson | Noted |
R1‑084037 | Remaining issues on SRS of TDD | CATT, CMCC, Ericsson, Huawei, Nokia, Nokia Siemens Networks, RITT, ZTE, TI | Revised |
R1‑084038 | 36.213 CR0108R1 (Cat F, Rel-8): Final details on codebook subset restrictions | Ericsson, LGE, NEC, NTT DoCoMo, Qualcomm Europe | Noted |
R1‑084039 | 36.213 CR0112R1 (Cat F, Rel-8): CQI/PMI reference measurement periods | Panasonic, Ericsson, Philips | Agreed |
R1‑084040 | 25.214 CR0506R2 (Rel-8,A) Correction to the description of CPC procedures | Huawei | Agreed |
R1‑084041 | 25.214 CR0507R2 (Rel-8, B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers | Huawei | Withdrawn |
R1‑084042 | 36.213 Draft CR (Rel-8, F) Change for DCI format 1A and 1C for broadcast control and update of DCI formats | Motorola, LGE, Panasonic, Philips, Nokia Siemens Networks, Nortel, Samsung | Noted - Revised |
R1‑084043 | 36.212 Draft CR (Rel-8, F) Change for determining DCI format 1A TBS table colun indicator for broadcast control | Motorola, LGE, Panasonic, Philips, Nokia Siemens Networks, Nortel, Samsung | Noted - Revised |
R1‑084044 | 36.211 CR0099 (Rel-8, F) Clarifying UL VRB allocation | Qualcomm Europe, Samsung, NEC, LGE, Huawei, Motorola | Agreed |
R1‑084045 | 36.213 CR0135 (Rel-8, F) Clarifying UL VRB allocation | Qualcomm Europe, Samsung, NEC, LGE, Huawei, Motorola | Agreed |
R1‑084046 | Way forward on support of ACK/NAK repetition | TI, LGE, Samsung, Motorola, ZTE, NTT DoCoMo, RIM, CMCC, CATT | Agreed |
R1‑084047 | Correction on TDD ACK/NACK multiplexing mapping schems for M=4 | TI, Ericsson, Huawei, ZTE, CATT | Not treated |
R1‑084049 | Draft CR on clarification of PUCCH resource hopping | Qualcomm Europe, Samsung, TI, NTT DoCoMo, Motorola, Ericsson | Noted - Revised |
R1‑084050 | 36.213 CR0105R5 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑084051 | 36.211 CR0084R4 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Revised |
R1‑084052 | Remaining issues on SRS of TDD | CATT, CMCC, Ericsson, Huawei, Nokia, Nokia Siemens Networks, RITT, ZTE, TI | Noted - Revised |
R1‑084053 | Specifying blank subframes for efficient support of relays | Qualcomm Europe | Not treated |
R1‑084054 | Support of Rel-8 UEs by LTE-A Relays | Qualcomm Europe | Not treated |
R1‑084055 | LS on measurement gap for TDD | RAN1, CATT | Agreed |
R1‑084056 | LS Response to Semi-Persistent Scheduling Activation with single PDCCH | RAN1, Qualcomm Europe | Agreed |
R1‑084057 | Response LS on RAN2 decision to use Pathloss parameter in the RACH preamble group selection | RAN1, LGE | Agreed |
R1‑084058 | Reply LS on PDCCH DL data arrival | RAN1, Ericsson | Agreed |
R1‑084059 | Way forward on remaining issues for TDD ACK/NACK Transmission on PUSCH | CATT, CMCC, Ericsson, Huawei, LGE, Nokia, Nokia Siemens Networks, Qualcomm Europe, ZTE, TI | Agreed |
R1‑084060 | 36.213 CR0105R6 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Agreed |
R1‑084061 | 36.211 CR0084R5 (Cat F, Rel-8): Alignment of RAN1/RAN2 specification | Ericsson | Agreed |
R1‑084062 | [DRAFT] LS Response to LS on UE Emissions | Motorola | Noted - Revised |
R1‑084063 | LS on transport block size on BCH | RAN1, NTT DoCoMo | Agreed |
R1‑084064 | 36.213 CR0107R1 (Cat F, Rel-8): General correction of reset of power control and random access response message | Ericsson | Agreed |
R1‑084065 | Draft LS on the HS-DPCCH structure for Dual-Cell HSDPA operation | Ericsson | Noted - Revised |
R1‑084066 | LS on the HS-DPCCH structure for Dual-Cell HSDPA operation | RAN1, Ericsson | Agreed |
R1‑084067 | LS on RV Determination for BCCH | RAN1, Nokia Siemens Networks | Agreed |
R1‑084068 | LS on default value of UL-bandwidth | NEC Group | Agreed |
R1‑084069 | LS Response to LS on UE Emissions | RAN1, Motorola | Agreed |
R1‑084070 | Remaining issues on SRS of TDD | CATT, CMCC, Ericsson, Huawei, Nokia, NSN, Motorola, RITT, Samsung, TI, ZTE | Agreed |
R1‑084072 | LS on the required timing relationship between the synchronization signal and the downlink reference signal | RAN1, Nortel | Agreed |
R1‑084073 | 36.211 CR0094R1 (Rel-8, F) On linkage Among UL Power Control Parameters | Qualcomm Europe | Agreed |
R1‑084074 | 36.211 CR0100 (Rel-8, F) Clarification on PUCCH resource hopping | Qualcomm Europe, Samsung, TI, NTT DoCoMo, Motorola, Ericsson | Agreed |
R1‑084075 | 36.211 CR0092R1 (Rel-8, F) Correction to the uplink DM RS assignment | LGE, Panasonic, Samsung, Ericsson | Agreed |
R1‑084076 | 36.211 CR0097R1 (Rel-8, F) SRS subframe configuration | Nokia Siemens Networks, Nokia | Agreed |
R1‑084077 | 36.213 CR0134 (Rel-8, F) Change for DCI format 1A and 1C for broadcast control and update of DCI formats | Motorola, LGE, Panasonic, Philips, Nokia Siemens Networks, Nortel, Samsung | Agreed |
R1‑084078 | 36.212 CR0059 (Rel-8, F) Change for determining DCI format 1A TBS table colun indicator for broadcast control | Motorola, LGE, Panasonic, Philips, Nokia Siemens Networks, Nortel, Samsung | Agreed |
page generated from database: 2024-04-13 13:51:47