The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R1-53b - 2008-06-30 to 2008-07-04, Warsaw

meeting id: R1-53b (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1‑082271 Draft Agenda for RAN1#53bis meeting RAN1 Chairman Approved
R1‑082272 Final report of RAN1#53 meeting MCC Support Approved
R1‑082273 Impact of the PMI/RI Report Drop on the PUCCH CQI Report SHARP Not treated
R1‑082274 Reply LS on E-AICH Power Offset and Error Targets for AICH/E-AICH RAN2, Qualcomm Noted
R1‑082275 Reply LS on 1.28 Mcps TDD HS-DSCH physical layer categories and related transport block sizes for 64-QAM modulation RAN2, TD Tech Noted
R1‑082276 LS on TTI Bundling RAN2, Nokia Siemens Networks Noted
R1‑082277 Reply LS on Earthquake and Tsunami Warning System RAN2, NTT DoCoMo Noted
R1‑082278 Reply LS on information about new PDCCH Format 1C RAN2, Qualcomm Noted
R1‑082279 Reply LS on Transport Block Sizes RAN2, Samsung Noted
R1‑082280 Semi-Persistent Scheduling Activation with single PDCCH RAN2, Qualcomm Noted
R1‑082281 LS on System information scheduling RAN2, NTT DoCoMo Noted
R1‑082282 LS on synchronization of L1 parameter from system information RAN2, Panasonic Noted
R1‑082283 LS on CSG cell identification RAN2, Qualcomm Noted
R1‑082284 RSRP Reporting Range RAN4, Ericsson Noted
R1‑082285 LS on RSRP definition RAN4, Nokia Noted
R1‑082286 RESPONSE LS on downlink power settings RAN4, Nokia Noted
R1‑082287 LS Response on Transmission of Physical Layer Parameters RAN4, Ericsson Noted
R1‑082288 LS on allowing DTX on E-DPCCH RAN5, Qualcomm Noted
R1‑082289 Reply LS on CSG related mobility (stage 2 text) SA1, Nokia Siemens Networks Noted
R1‑082290 LS on Earthquake and Tsunami Warning System SA2, NTT DoCoMo Noted
R1‑082291 Reserving an E-AI for future use Qualcomm Europe Revised
R1‑082292 Further HS-DPCCH Design Options and Cubic Metric Analysis for N_max_dpdch=1 Qualcomm Europe Noted
R1‑082293 Link Budget Impact due to DC-HSDPA operation Qualcomm Europe Revised
R1‑082294 DC-HSDPA and CPC Qualcomm Europe Noted
R1‑082295 Draft CR on PDCCH search space ASUSTeK Revised
R1‑082296 Differentiation between LTE home and macro eNBs Samsung Noted
R1‑082297 Required reliability of SPS uplink grant Samsung Revised
R1‑082298 Limiting TB size for SPS Samsung Noted
R1‑082299 Proposed update for CR to 25.211 for Enhanced Uplink for CELL_FACH state Samsung Revised
R1‑082300 Proposed update for CR to 25.214 for Enhanced Uplink for CELL_FACH state Samsung Revised
R1‑082301 RE puncturing pattern for RS boosting Samsung Noted
R1‑082302 Clarification on mapping of cyclic shift field in DCI format 0 Samsung Noted
R1‑082303 ACK/NAK Repetitions in E-UTRA UL Samsung Not treated
R1‑082304 Increasing PUCCH Multiplexing Capacity Samsung Noted
R1‑082305 36.211 CR0044 (Rel-8, F) Frequency Shift Definition for UE-Specific Downlink RS Samsung Not treated
R1‑082306 Implicit CCE to uplink ACK/NACK mapping in TDD Samsung Not treated
R1‑082307 UE specific signaling for SRS Samsung, CATT, ZTE, RITT Not treated
R1‑082308 On CQI/PMI, RI and Uplink data multiplexing Samsung Noted
R1‑082309 ACK/NAK DTX Detection in the PUSCH Samsung Noted
R1‑082310 36.212 CR0025 (Rel-8, F) Simplified formula for linking control resources in PUSCH to PUSCH MCS Samsung Noted - Revised
R1‑082311 Indication of codewords in dynamic switching from format 1A to format 2 Samsung, Texas Instrument Revised
R1‑082312 Optimized mapping order for RI Samsung Noted
R1‑082313 CQI Reporting for MU-MIMO Samsung Not treated
R1‑082314 36.213 CR0035 (Rel-8, F) Correction on Calculation of ΔTF(i) for UL-PC Samsung Noted
R1‑082315 36.213 CR0036 (Rel-8, F) Specification of Configurability of Simultaneous ACK/NAK and CQI Transmission in PUCCH Samsung Not treated
R1‑082316 36.213 CR0037 (Rel-8, F) Correction on SRS hopping for closed loop antenna selection Samsung Revised
R1‑082317 36.213 CR0038 (Rel-8, F) Clarification on PUSCH frequency hopping procedure Samsung Revised
R1‑082318 36.213 CR0039 (Rel-8, F) Clarification on uplink power control Samsung Agreed in principle
R1‑082319 36.213 CR0040 (Rel-8, F) Clarification on UE procedure for receiving PDCCH Samsung Not treated
R1‑082320 36.213 CR0041 (Rel-8, F) Clarification on DCI formats using resource allocation type 2 Samsung Agreed
R1‑082321 36.213 CR0042 (Rel-8, F) Clarification on resource allocation type 1 Samsung Missing
R1‑082322 36.213 CR0043 (Rel-8, F) Clarification on tree structure of CCE aggregations Samsung Revised
R1‑082323 Discussion on the HS-DSCH serving cell change Samsung Not treated
R1‑082324 Uplink control channel for dual-cell HSDPA Samsung Noted
R1‑082325 Inter-cell interference management and network MIMO Samsung Not treated
R1‑082326 Superposition of Unicast and Broadcast Samsung Not treated
R1‑082327 Application of network coding in LTE-advanced relay Samsung Noted
R1‑082328 Evaluation Environments and Requirements for LTE-A Motorola Noted
R1‑082329 Sounding Maximum Bandwidth on UpPTS Motorola Noted
R1‑082330 Draft CR on Correction to Uplink PUCCH CQI Slot-level CS Remapping Motorola Noted
R1‑082331 Draft CR on Uplink DM RS PUSCH Sequence-shift Pattern Motorola Noted
R1‑082332 Further Results on DC Subcarrier on UL Motorola Missing
R1‑082333 Further Definition of DCI Format 1C Motorola Noted
R1‑082334 UL Bundling for TDD Motorola Noted
R1‑082335 Remaining details on DCI Format 2 Motorola Noted
R1‑082336 ACK/NACK DTX detection in PUSCH Motorola Noted
R1‑082337 EUL load balancing in DC-HSDPA HUAWEI Not treated
R1‑082338 Simulation of independent schedule scheme in DC-HSDPA HUAWEI Revised
R1‑082339 Proposal of HS-DPCCH Design for DC-HSDPA HUAWEI Noted
R1‑082340 25.212 CR0265 (Rel-7,F) Correction to the table name and the quoted name HUAWEI Noted - Revised
R1‑082341 25.212 CR0266 (Rel-8,A) Correction to the table name and the quoted name HUAWEI Noted - Revised
R1‑082342 25214 CR0493(Rel-7,F) Clarification on HS-DPCCH power offset when boosted HUAWEI Noted
R1‑082343 25214 CR0494 (Rel-8,A) Clarification on HS-DPCCH power offset when boosted HUAWEI Noted
R1‑082344 25214 CR0495 (Rel-7,F) Clarification on power control timing with uplink DPCCH slot format #4 HUAWEI Noted
R1‑082345 25214 CR0496 (Rel-8,A) Clarification on power control timing with uplink DPCCH slot format #4 HUAWEI Noted
R1‑082346 25.224 CR0185 (Rel-7, F) on HS-SCCH and HS-SICH power control enhancement for 1.28Mcps TDD TD Tech Revised
R1‑082347 VoIP system level simulation results for 1.28Mcps TDD CPC TD Tech Noted
R1‑082348 Further simulation results on stand alone midamble signal for 1.28Mcps TDD TD Tech Noted
R1‑082349 Midamble allocation scheme for 1.28Mcps TDD MIMO TD Tech Noted
R1‑082350 Use of UL-Index in UL Grant for A/N Multiplexing in PUSCH in TDD TD Tech Not treated
R1‑082351 Consideration on DCI format for downlink MU-MIMO Huawei Not treated
R1‑082352 Power offset signaling for MU-MIMO Huawei Not treated
R1‑082353 Remaining issues on SRS hopping Huawei Revised
R1‑082354 Remaining Control Signaling Issues for close-loop SM Huawei Not treated
R1‑082355 PUCCH Resource Allocation for ACK/NACK Repetition Huawei Not treated
R1‑082356 Discussion on RSN bits for PDCCH Format 1C Huawei Revised
R1‑082357 MCS offset between data and control signaling on PUSCH Huawei Not treated
R1‑082358 Remaining issues on downlink control channel Huawei Revised
R1‑082359 Implicit mapping between CCE and PUCCH for ACK/NACK TDD Huawei, CMCC, CATT, TD-Tech Not treated
R1‑082360 Consideration on whole image on A/N bundling and Multi A/N multiplexing in TDD Huawei, TD-Tech Noted
R1‑082361 Bandwidth part sizes for UE selected CQI reports on the PUCCH NEC Group Not treated
R1‑082362 Further clarification on precoding confirmation NEC Group Revised
R1‑082363 Bitmap convention for resource allocation NEC Group Noted
R1‑082364 Further clarifications on resource allocation type 0 and type 1 NEC Group Revised
R1‑082365 UL Access Scheme for LTE-Advanced NEC Group Noted
R1‑082366 MAC architecture for DC-HSDPA NEC Group Not treated
R1‑082367 False Positive on Semi-Persistent Scheduling NEC Group Withdrawn
R1‑082368 On the need for signalling Target Cell SFN during Handover NEC Group Withdrawn
R1‑082369 ACK/NACK transmission in PUCCH format 2a & 2b ZTE Noted
R1‑082370 Segmentation of PHICH scrambling ZTE Not treated
R1‑082371 Modified PUCCH formats 1/1a/1b for extended CP ZTE Noted
R1‑082372 Multiple ACK/NACK for TDD ZTE Not treated
R1‑082373 On the Remaining Issues of PUCCH slot-based CS/OC remapping ZTE Noted
R1‑082374 DTX Detection of ACKNAK transmitted in PUSCH ZTE Noted
R1‑082375 Number of OFDM symbols of PDCCH in DwPTS for Narrow BW ZTE Noted
R1‑082376 Cell-specific Frequency Shift for UE Specific RS ZTE Not treated
R1‑082377 Text Proposal for Uplink RI Position Change ZTE, CHTTL Noted
R1‑082378 Discussions on report format for overload indicator ZTE, CHTTL Not treated
R1‑082379 Two-threshold RSRP trigger mechanism ZTE, CHTTL Not treated
R1‑082380 Technical scope for LTE-Advanced evolution. ZTE Noted
R1‑082381 The spectrum band for Further Enhanced Dedicated Carrier MBMS in LTE-Advanced System ZTE Not treated
R1‑082382 Suggestions on the frame structure of HS-SCCH for MIMO in 1.28Mcps TDD system ZTE Noted
R1‑082383 Details of HS-SICH signalling for MIMO in 1.28Mcps TDD system ZTE Noted
R1‑082384 Suggestions on Midamble Allocation for MIMO Dual Streams in 1.28Mcps TDD System ZTE Noted
R1‑082385 Analysis of HSPA plus Downlink CPC Solution in 1.28Mcps TDD System ZTE Noted
R1‑082386 Analysis of HSPA plus Uplink CPC Solution in 1.28Mcps TDD System ZTE Noted
R1‑082387 From Single band SC-FDMA to its multi-band implementation in the uplink Spreadtrum Communications Noted
R1‑082388 On the terminal capabilities of IMT-advanced Spreadtrum Communications Not treated
R1‑082389 Exploiting the potentials of TDD schems for IMT-advanced Spreadtrum Communications Not treated
R1‑082390 Exploit TDD reciprocity to reduce SRS and CQI reporting load in IMT-Advanced Spreadtrum Communications Not treated
R1‑082391 RSRP event-and-timer trigger scheme Spreadtrum Communications Not treated
R1‑082392 25.215 CR0189 (Rel-8, B) "UPH measurement support for Enhanced Uplink for CELL_FACH state" Nokia, Nokia Siemens Networks Agreed
R1‑082393 EUL power control behaviour Nokia Siemens Networks, Nokia Noted
R1‑082394 Need of uplink acknowledgement for serving cell change enhancement proposal Nokia, Nokia Siemens Networks Not treated
R1‑082395 Dual HS-DPCCH coverage Nokia Siemens Networks, Nokia Noted
R1‑082396 Evaluation Methodologies for the SLS with Relay Panasonic Noted
R1‑082397 Discussion on the various types of Relays Panasonic Noted
R1‑082398 Consideration on Multicarrier Transmission scheme for LTE-Adv uplink Panasonic Noted
R1‑082399 Modulation order determination for uplink retransmissions Panasonic, Motorola Noted
R1‑082400 Single codeword indication on DCI format 2 Panasonic Not treated
R1‑082401 Contents of PDCCH format 1C Panasonic Noted
R1‑082402 Wayforward on the ACK/NACK repetition for PUCCH Panasonic Not treated
R1‑082403 Necessity of the scrambling for ACK/NACK on PUCCH Panasonic Noted
R1‑082404 Necessity of the scrambling for the reference signal of CQI in PUCCH Panasonic Noted
R1‑082405 Draft CR on Orthogonal cover sequence for shortened PUCCH format 1a and 1b Panasonic, LGE, NextWave Wireless Noted - Revised
R1‑082406 CQI/PMI/RI configuration parameters Panasonic Missing
R1‑082407 Restriction of RI offset for CQI on PUCCH in TS 36.213 Panasonic Not treated
R1‑082408 Early CQI/PMI/RI after handover Panasonic Not treated
R1‑082409 RB restriction and modulation order for CQI-only transmission on PUSCH Panasonic, LGE Noted
R1‑082410 Bandwidth configuration for SRS transmission within UpPTS Panasonic Withdrawn
R1‑082411 PRACH frequency position for frame structure type 1 and 2 Panasonic Revised
R1‑082412 Draft CR on PRACH configuration for frame structure type 1 Panasonic Noted - Revised
R1‑082413 Repetition of paging message Panasonic Noted
R1‑082414 RNTI assignment and random access procedures Panasonic Noted
R1‑082415 Synchronization of L1 parameter from system information (Reply to: R2-082898) Panasonic Noted
R1‑082416 Persistent scheduling and MIMO mode Panasonic Not treated
R1‑082417 Timing of CQI reference period Panasonic Noted
R1‑082418 Correction of subscripts in TS 36.213 section 7.2.2 Panasonic Not treated
R1‑082419 Considerations on SI transmission/reception LG Electronics Noted
R1‑082420 Proposed reply to RAN2 LS on system information scheduling (R2-082738) LG Electronics Noted
R1‑082421 Correction of PUCCH index generation formula LGE, Nokia, Nokia Siemens Networks, Panasonic, Ericsson, TI, Samsung Noted - Revised
R1‑082422 Correction of PHICH to RE mapping in extended CP subframe LGE, NEC, Nortel, Samsung Noted
R1‑082423 Corrections to Rank information scrambling in uplink shared channel inTS36.211 LG Electronics Revised
R1‑082424 Correction of mapping of ACK/NAK to binary bit values in TS36.211 LGE, Ericsson, TI Noted - Revised
R1‑082425 Correction to scrambling of PUSCH carrying RACH message 3 LG Electronics Noted
R1‑082426 Scrambling of PUSCH carrying RACH Message 3 LG Electronics Noted
R1‑082427 Design of PDCCH DCI format 1C LG Electronics Revised
R1‑082428 Consideration on CSG Flag in Physical Cell ID LG Electronics Withdrawn
R1‑082429 Definition of Code Rate in PUSCH control information MCS calculation LG Electronics Noted
R1‑082430 Remaining Issues with PUSCH control MCS calculation LG Electronics Noted
R1‑082431 PUSCH control information offsets LG Electronics Not treated
R1‑082432 Issues with target quality requirements for ACK/NACK transmission in PUSCH LG Electronics Noted
R1‑082433 Corrections to Rank information scrambling in uplink shared channel in TS36.212 LG Electronics Revised
R1‑082434 Correction of mapping of ACK/NAK to binary bit values in TS36.212 LGE, Ericsson, TI Revised
R1‑082435 Further clarifications on confirmation field in DCI format 2 LG Electronics Noted - Revised
R1‑082436 Remaining Details on PDCCH Contents LG Electronics Not treated
R1‑082437 Necessity of Shortened PUCCH format 1 (Scheduling Request) LG Electronics Not treated
R1‑082438 Efficient Utilization of Unused PUCCH RB LG Electronics Not treated
R1‑082439 Issues with PHICH modifier LG Electronics Noted
R1‑082440 Correction to the formula for uplink PUSCH power control LGE Revised
R1‑082441 Correction to the downlink resource allocation LG Electronics Revised
R1‑082442 Correction to UL DM RS cyclic shift to PHICH index mapping LG Electronics Not treated
R1‑082443 Remaining issues on TA LGE, Panasonic Noted
R1‑082444 Definition of the DL/UL timing relationships LGE, Panasonic Agreed in principle
R1‑082445 Error case handling in bundled ACK/NACK for TDD LG Electronics Withdrawn
R1‑082446 CCE to bundled ACK/NACK PUCCH index mapping for TDD LG Electronics Not treated
R1‑082447 Remaining Details on MU-MIMO transmission Mode LG Electronics Not treated
R1‑082448 Carrier aggregation in Advanced E-UTRA Huawei Noted
R1‑082449 On TTI bundling for LTE TDD Ericsson Revised
R1‑082450 Introducing missing L1 parameters into 36.211 Ericsson Revised
R1‑082451 Correction of the PRACH resource location Ericsson Noted - Revised
R1‑082452 Correction of n_cs(n_s) PUCCH format 1 Ericsson Noted
R1‑082453 On Multiplexing multiple ACK/NAK for TDD Ericsson Not treated
R1‑082454 On the uplink-downlink radio frame timing in LTE FDD Ericsson Not treated
R1‑082455 On ACK/NAK detection on PUSCH Ericsson Noted
R1‑082456 Offsets for linkage between PUSCH MCS and control Ericsson Not treated
R1‑082457 ACK/NAK mapping for extended cyclic prefix on PUCCH Ericsson Missing
R1‑082458 Introducing missing L1 parameters into 36.213 Ericsson Revised
R1‑082459 Alignment of RAN1/2 RACH specification Ericsson Not treated
R1‑082460 Remaining Issues with TBS & MCS Settings Ericsson Revised
R1‑082461 Correction of maximum TBS sizes Ericsson Revised
R1‑082462 Remaining issues for TDD ACK/NAK bundling and PUSCH Ericsson Noted
R1‑082463 Mapping from CCE index to PUCCH resource TDD Ericsson Not treated
R1‑082464 Remaining Details on Control Signaling for the MU-MIMO Transmission Mode Ericsson Not treated
R1‑082465 Finalizing the CQI Definition Ericsson Not treated
R1‑082466 RSRP measurements for multiple TX antenna ports Ericsson Noted
R1‑082467 UE category 3 soft bit buffer split for MIMO LTE TDD Ericsson Noted
R1‑082468 Carrier aggregation in LTE-Advanced Ericsson Noted
R1‑082469 LTE-Advanced – Coordinated Multipoint transmission/reception Ericsson Not treated
R1‑082470 Self backhauling and lower layer relaying Ericsson Noted
R1‑082471 Multiple ACK/NACK transmission for TDD Motorola Revised
R1‑082472 Association between DL control channel and UL ACK/NAK resource for TDD Motorola Not treated
R1‑082473 Remaining details on ACK/NACK bundling for TDD Motorola Noted
R1‑082474 ACK/NACK Repetition Motorola Not treated
R1‑082475 UL Power Control for Re-transmission Motorola Noted
R1‑082476 UL TTI Bundling Performance and Consideration Motorola Noted
R1‑082477 Improved EUL power control at UE power limitation Ericsson Noted
R1‑082478 Introduction of HS-PDSCH Serving Cell Change Enhancements Ericsson Noted
R1‑082479 Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers Ericsson Noted
R1‑082480 DC-HSDPA and CPC Ericsson Noted
R1‑082481 Comparison of Equivalent and Non-Equivalent Carrier Deployments for DC-HSPA InterDigital Noted
R1‑082482 36.211 CR0045 (Rel-8, F) Refinement for REG Definition for n = 4 Texas Instruments, Ericsson, LG, Samsung, ZTE Not treated
R1‑082483 Draft CR on Correction of SRS Frequency Position and Nb Values Texas Instruments Not treated
R1‑082484 On Remaining Issues of PUCCH Slot Based CS/OC Remapping Texas Instruments, Samsung, Panasonic Revised
R1‑082485 Update on Physical Layer Parameters for CQI Reporting Texas Instruments Revised
R1‑082486 SRI Resource Configuration on PUCCH Texas Instruments Not treated
R1‑082487 ACK/NAK DTX Detection for Concurrent Transmission of ACK/NAK and SRI Texas Instruments Not treated
R1‑082488 RRC Configured ACK/NAK Repetition in EUTRA Uplink Texas Instruments Noted
R1‑082489 Multiple ACK/NAK Transmission in TDD Texas Instruments Not treated
R1‑082490 Concurrent Transmission of Multiple ACK/NAK and other Control Signaling in TDD UL Texas Instruments Not treated
R1‑082491 Transmission of Repeated ACKNAK in Uplink Texas Instruments Noted
R1‑082492 UE Specific SRS Configuration Texas Instruments Not treated
R1‑082493 Reference for CQI/PMI Reporting Offset Texas Instruments Revised
R1‑082494 36.213 CR0044 (Rel-8, F), On Reference for CQI/PMI Reporting Offset Texas Instruments Not treated
R1‑082495 36.213 CR0045 (Rel-8, F), Resolving Editor's Notes on y in 36.213 Texas Instruments Not treated
R1‑082496 UL SU-MIMO for E-UTRA Texas Instruments Revised
R1‑082497 Network MIMO Precoding Texas Instruments Not treated
R1‑082498 Support to co-existence of different UL/DL allocations for LTE TDD Alcatel Shanghai Bell, Alcatel-Lucent Not treated
R1‑082499 UL multi-cell MIMO: Multi-cell MIMO with distributed inter-cell interference cancellation for LTE-A uplink Alcatel Shanghai Bell, Alcatel-Lucent Not treated
R1‑082500 UL SU-MIMO: STBC-II Scheme for Uplink Transmit Diversity in LTE-Advanced Alcatel Shanghai Bell, Alcatel-Lucent Noted
R1‑082501 DL Collaborative MIMO: DL Collaborative MIMO for LTE-A Alcatel Shanghai Bell, Alcatel-Lucent Not treated
R1‑082502 Approach for Classification of LTE Advanced Technologies Alcatel-Lucent Not treated
R1‑082503 MIMO and CQI-Techniques for LTE-Advanced Alcatel-Lucent Not treated
R1‑082504 M2M Communication Alcatel-Lucent Not treated
R1‑082505 Performance bounds for LTE Advanced using MU-MIMO Alcatel-Lucent Not treated
R1‑082506 Introducing missing L1 parameters into 36.212 Ericsson Noted
R1‑082507 Draft LS on the signaling of the number of antenna ports during handover Nortel Noted
R1‑082508 Modification on UE-Specific RS for Extended CP Nortel Noted
R1‑082509 On DCI Format for Open-loop MIMO Nortel Noted
R1‑082510 On the formula for linkage between PUSCH MCS and amount of resources used for control Nortel Revised
R1‑082511 Discussion on Sub-band CQI Measurement Nortel Not treated
R1‑082512 On Signaling Power Level for Downlink MU-MIMO Nortel Not treated
R1‑082513 Open issues on TBS signaling Nortel Noted
R1‑082514 Corrections on PUSCH feedback Nortel Not treated
R1‑082515 Proposed changes to PDSCH transmission modes Nortel Not treated
R1‑082516 UL Enhancement for LTE-advanced Nortel Noted
R1‑082517 Relay Frame Structures for FDD Nortel Noted
R1‑082518 MIMO Enhancement for Nomadic UE Nortel Not treated
R1‑082519 Proposed outlines for LTE-Advanced TR Nortel Noted
R1‑082520 An overview of opportunistic space time multiple access Nortel Not treated
R1‑082521 Need to modify event triggers for DC-HSDPA hotspot scenarios Qualcomm Europe Noted
R1‑082522 Uplink transmit diversity schemes for LTE Advanced Mitsubishi Electric Noted
R1‑082523 Procedures for collisions between periodic and aperiodic CQI/PMI/RI reports and Draft CR to 36.213 InterDigital Communications LLC Not treated
R1‑082524 Corrections to TS36.211 Philips, NXP Not treated
R1‑082525 Corrections to TS36.212 Philips, NXP Agreed in principle
R1‑082526 Index for PDCCH signalling of UL resource allocation in conjunction with DRX Philips, NXP Noted
R1‑082527 PDCCH message information content for persistent scheduling Philips, NXP Noted
R1‑082528 CQI reference measurement period Philips, NXP Revised
R1‑082529 Configuration of CQI modes Philips, NXP Not treated
R1‑082530 CQI for UE-specific RS Philips, NXP Revised
R1‑082531 CQI definition for MU-MIMO Philips, NXP Revised
R1‑082532 Control channel support for HSDPA Dual-Cell operation Philips, NXP Noted
R1‑082533 Discussion of Technologies for LTE-Advanced Philips, NXP Noted
R1‑082534 Correction for discrimination between DCI format 1 and format 1A LG Electronics Withdrawn
R1‑082535 Correction for handling remaining REs LG Electronics Noted - Revised
R1‑082536 Correctioin to CCE search space LG Electronics Withdrawn
R1‑082537 25.224 CR0186 (Rel-8, A) on HS-SCCH and HS-SICH power control enhancement for 1.28Mcps TDD TD Tech Revised
R1‑082538 Draft LS reply on information about new PDCCH Format 1C Qualcomm Europe Withdrawn
R1‑082539 Draft LS reply on CSG cell identification Qualcomm Europe Not treated
R1‑082540 Extending the PCI space Qualcomm Europe Noted
R1‑082541 Draft LS reply on Semi-Persistent Scheduling Activation with single PDCCH Qualcomm Europe Noted - Revised
R1‑082542 Details on SPS Activation with single PDCCH Qualcomm Europe Noted
R1‑082543 Clarification of PDCCH search space Qualcomm Europe Noted
R1‑082544 Confusing multiple PDCCH aggregation levels Qualcomm Europe Noted
R1‑082545 Clarification for PHICH mapping for small bandwidths requiring 4 OFDM symbols for control Qualcomm Europe Noted
R1‑082546 Further details on UL ACK/NAK resource allocation for mixed RB case' Qualcomm Europe Noted
R1‑082547 Mapping of resources for UL ACK in TDD mode Qualcomm Europe Not treated
R1‑082548 PDCCH format 1B Qualcomm Europe Noted - Revised
R1‑082549 Details on ACK repetition Qualcomm Europe Noted
R1‑082550 Confirmation of various UL transmission configurations Qualcomm Europe Not treated
R1‑082551 Power setting for PRACH transmission Qualcomm Europe Noted
R1‑082552 UL ACK/NAK assignment procedure Qualcomm Europe Missing
R1‑082553 Evaluation methodology for LTE-A - Mobility Qualcomm Europe, CMCC Noted
R1‑082554 Evaluation methodology for LTE-A - Heterogeneous deployments Qualcomm Europe, Vodafone Noted
R1‑082555 Advantages of synchronous network operation Qualcomm Europe Not treated
R1‑082556 New interference scenarios in LTE-A Qualcomm Europe Not treated
R1‑082557 36.211 CR0046 (Rel-8, F) Clarification on RI bits scrambling Samsung Revised
R1‑082558 BCCH Coverage Issues and Maximum SI-x TBS Motorola Not treated
R1‑082559 Simulation results of VoIP DL transmission for 1.28Mcps TDD CATT Revised
R1‑082560 Analysis on adaptive MIMO schemes for 1.28Mcps TDD CATT, ZTE Noted
R1‑082561 Reply LS on the TTI bundling for TDD CATT, CMCC, RITT, ZTE, Huawei Noted
R1‑082562 DVRB mapping in DwPTS and TP for 36.211 CATT, Samsung, Huawei Not treated
R1‑082563 SRS bandwidth in UpPTS and TP for 36.211 CATT, RITT, Huawei, Noted
R1‑082564 On collision between SRS and PRACH in UpPTS and TP for 36.213 CATT, Huawei Not treated
R1‑082565 Physical Layer Parameters for CQI reporting in TDD CATT Not treated
R1‑082566 CQI reporting period for TDD CATT Not treated
R1‑082567 Multiple A/Ns transmission for TDD CATT Revised
R1‑082568 Soft buffer allocation for TDD and TP for 36.212 CATT Noted
R1‑082569 Consideration on technologies for LTE-Advanced CATT Noted
R1‑082570 Signalling for SRS Hopping Bandwidth NTT DoCoMo Not treated
R1‑082571 Views on UL ACK/NAK Repetition Details NTT DoCoMo Noted
R1‑082572 Views on PDCCH Format 1C NTT DoCoMo Noted
R1‑082573 Evaluation Model for LTE-Advanced NTT DoCoMo Noted
R1‑082574 LTE-Advanced Target Values for Micro-cell, Indoor, and Rural/High Speed Environments NTT DoCoMo Noted
R1‑082575 Proposals for LTE-Advanced Technologies NTT DoCoMo Noted
R1‑082576 Inter-cell Radio Resource Management for Heterogeneous Network for LTE-Advanced NTT DoCoMo Not treated
R1‑082577 Editorial clarification of SRS transmissions when UL antenna selection is enabled Mitsubishi Electric Not treated
R1‑082578 Performance Evaluation of User Grouping Methods for Downlink Soft Frequency Reuse CHTTL, ITRI Not treated
R1‑082579 DL System Level Performance Comparison between 2GHz and 3.5GHz for Advanced E-UTRA Fujitsu Not treated
R1‑082580 On sub-carrier spacing Fujitsu Not treated
R1‑082581 Range and representation of delta_TF_PUCCH Ericsson Agreed in principle
R1‑082582 Improving the SRS frequency-hopping pattern for transmit antenna selection Mitsubishi Electric Not treated
R1‑082583 Proposed Response to LS on System Information Scheduling (R2-082893) Nokia Siemens Networks, Nokia Noted
R1‑082584 Proposed response to LS on CSG cell identification (R2-082899) Nokia Siemens Networks, Nokia Noted
R1‑082585 Consideration on TTI Bundling for LTE TDD Nokia, Nokia Siemens Networks Noted
R1‑082586 Semi Persistent Scheduling Activation and False Positive Grants Nokia, Nokia Siemens Networks Noted
R1‑082587 36.211 CR0047 (Rel-8, F) Correction to Scrambling of PUSCH with Rank Indication Nokia Siemens Networks, Nokia Noted
R1‑082588 36.211 CR0048 (Rel-8, F) Frequency Shifting of UE-specific RS Nokia Siemens Networks, Nokia Noted
R1‑082589 Multi-bits ACK/NACK signalling for LTE TDD Nokia, Nokia Siemens Networks Not treated
R1‑082590 ACK/NACK repetition Nokia Siemens Networks, Nokia Noted
R1‑082591 On SRS frequency position definition Nokia Siemens Networks, Nokia Noted
R1‑082592 Uplink sounding RS Nokia Siemens Networks, Nokia Noted
R1‑082593 36.212 CR0026 (Rel-8, F) Correction to PUSCH Channel Interleaver Nokia Siemens Networks, Nokia Agreed
R1‑082594 Control signalling on PUSCH: numerical values for the offset -parameter Nokia Siemens Networks, Nokia Not treated
R1‑082595 Rate matching for block codes applied with small CQI reports on PUSCH Nokia Siemens Networks, Nokia Noted
R1‑082596 ACK/NACK DTX detection on PUSCH Nokia Siemens Networks, Nokia Noted
R1‑082597 Performance of DL ACK/NACK signaling in PUSCH with and without ACK/NACK indication bit in UL grant Nokia Siemens Networks, Nokia Noted
R1‑082598 PDCCH format 1C signalling Nokia, Nokia Siemens Networks Noted
R1‑082599 On the removal of code rate limitations for PDCCH blind decoding Nokia, Nokia Siemens Networks Not treated
R1‑082600 Overload Indicator (OI) Configuration and Reporting Criteria Nokia Siemens Networks, Nokia Not treated
R1‑082601 DAI Design for LTE TDD configuration #5 (9:1) in ACK/NACK Bundling Nokia, Nokia Siemens Networks Revised
R1‑082602 Considerations on PUCCH indexing scheme for LTE TDD Nokia, Nokia Siemens Networks Revised
R1‑082603 36.213 CR0046 (Rel-8, F) PUCCH Power Control (TDD perspective) Nokia, Nokia Siemens Networks Agreed in principle
R1‑082604 PC of RACH message 3 Nokia Siemens Networks, Nokia Not treated
R1‑082605 Delta_tf values for PUCCH PC formula Nokia Siemens Networks, Nokia Noted
R1‑082606 Finalizing Multi-User MIMO for LTE Rel. 8 Nokia, Nokia Siemens Networks Not treated
R1‑082607 Way forward on DRS EPRE Nokia, Nokia Siemens Networks Not treated
R1‑082608 36.214 CR0006 (Rel-8, F) Modification to the RSRP definition Nokia, Nokia Siemens Networks Agreed
R1‑082609 Uplink Multiple access for LTE-Advanced Nokia Siemens Networks, Nokia Noted
R1‑082610 LTE-Advanced Simulation Methodology and Assumptions Nokia, Nokia Siemens Networks Noted
R1‑082611 PRACH Frequency location LG Electronics Inc. Noted
R1‑082612 Padding one bit to DCI format 1 when fomat 1 and fomat 0/1A have the same size NEC Group, LGE, Ericsson, Nokia, Nokia Siemens Networks, Alcatel-Lucent, Nortel, Texas Instruments, Motorola, Samsung, Broadcom, Philips Noted - Revised
R1‑082613 Linkage Among UL Power Control Parameters Qualcomm Europe Not treated
R1‑082614 Simulation of independent schedule scheme in DC-HSDPA HUAWEI Not treated
R1‑082615 DAI Design for LTE TDD configuration #5 (9:1) in ACK/NACK Bundling Nokia, Nokia Siemens Networks Noted
R1‑082616 Technical proposal for LTE-Advanced Hitachi, Ltd. Not treated
R1‑082617 Further clarification on precoding confirmation NEC Group Revised
R1‑082618 Draft Skeleton TR on Further Advancements for E-UTRA Physical Layer Aspects (Release 8) Rapporteur Noted - Revised
R1‑082619 Consequence analysis of Low/Medium features in LTE Rel-8 NTT DoCoMo Noted
R1‑082620 Way forward on TDD multi-bits ACK/NAK transmission Texas Instruments, ZTE, Huawei, CATT, Nokia, Nokia Siemens Networks Noted
R1‑082621 Draft CR on support of ACK/NAK repetition via RRC configuration Texas Instruments Not treated
R1‑082622 Proposed response to LS on PDCCH Format 1C (to R1-082278) Huawei Not treated
R1‑082623 Remaining issues on downlink control channel Huawei Noted
R1‑082624 Power control of PRACH LG Electronics Inc. Not treated
R1‑082625 Introducing PRACH Configuration Index for FDD Ericsson Not treated
R1‑082626 On TTI bundling for LTE TDD Ericsson Noted
R1‑082627 36.213 CR0047 (Rel-8, F) Removal of CR0009 Ericsson Not treated
R1‑082628 PDCCH on common search space Panasonic Not treated
R1‑082629 36.211 CR0046R1 (Rel-8, F) Rank scrambling in PUSCH Samsung, LGE Noted - Revised
R1‑082630 36.212 CR0027 (Rel-8, F) Rank scrambling in PUSCH Samsung, LGE Noted - Revised
R1‑082631 Clarification on mapping of Differential CQI fields Samsung Not treated
R1‑082632 LS on CQI definition RAN4, Ericsson Noted
R1‑082633 RSRQ Definition Update RAN4, Ericsson Noted
R1‑082634 RSRQ Reporting Range RAN4, Ericsson Noted
R1‑082635 MIKEY usage clarification OMA, Irdeto, Alcatel-Lucent Noted
R1‑082636 SRS hopping pattern for closed loop antenna selection Samsung, Mitsubishi Electric, LGE, Motorola, NTT DoCoMo, Panasonic, Qualcomm, Texas Instruments Agreed
R1‑082637 Considerations on PUCCH indexing scheme for LTE TDD Nokia, Nokia Siemens Networks Not treated
R1‑082638 Reply LS on Earthquake and Tsunami Warning System SA2, NTT DoCoMo Noted
R1‑082639 Required reliability of SPS uplink grant Samsung Noted
R1‑082640 Reply LS on allowing DTX on E-DPCCH Qualcomm Europe Revised
R1‑082641 Correction of mapping of ACK/NAK to binary bit values in TS36.212 LGE, Ericsson, TI Noted - Revised
R1‑082642 Reply LS on TTI bundling RAN1, Ericsson Agreed
R1‑082643 36.213 CR0037R1 (Rel-8, F) Correction on SRS hopping for closed loop antenna selection Samsung Revised
R1‑082644 PRACH frequency position for frame structure type 1 and 2 Panasonic Noted
R1‑082645 36.213 CR0043R1 (Rel-8, F) Clarification on tree structure of CCE aggregations Samsung, Ericsson Not treated
R1‑082646 Draft CR to 36.214 on Modification of RSRQ and removal of RSSI Ericsson Revised
R1‑082647 Draft CR to 36.214 on Modification of RSRQ and removal of RSSI Ericsson Noted - Revised
R1‑082648 Draft LS response to LS on synchronization of L1 parameter from system information Panasonic Revised
R1‑082649 Multiple A/Ns transmission for TDD CATT Not treated
R1‑082650 36.214 CR0007 (Rel-8, F) Modification of RSRQ and removal of RSSI Ericsson Agreed
R1‑082651 25.215 CR0190 (Rel-8, F) Modification of RSRQ and removal of RSSI Ericsson Agreed
R1‑082652 Correction to the formula for uplink PUSCH power control LGE, Motorola, Philips, Qualcomm Noted
R1‑082653 Design of PDCCH DCI format 1C LG Electronics Noted
R1‑082654 Maximum supportable payload sizes for broadcast channels LGE Not treated
R1‑082655 Introducing missing L1 parameters into 36.211 Ericsson Not treated
R1‑082656 36211 CR0049 (Rel-8, F) Correction of PHICH to RE mapping in extended CP subframe LGE, NEC, Nortel, Samsung Agreed in principle
R1‑082657 36211 CR0050 (Rel-8, F) Correction for handling remaining REs LGE Agreed in principle
R1‑082658 Draft CR to 36.213 on DCI format for broadcast control TI, Motorola, NEC Not treated
R1‑082659 Multiple ACK/NACK transmission for TDD Motorola, Qualcomm, Ericsson Noted
R1‑082660 On Remaining Issues of PUCCH Slot Based CS/OC Remapping Texas Instruments, Samsung, Panasonic, ZTE, LGE Noted - Revised
R1‑082661 36211 CR0051 (Rel-8, F) on PRACH configuration for frame structure type 1 Panasonic Agreed in principle
R1‑082662 Way forward for implicit PUCCH ACK/NACK indexing in TDD LGE, Ericsson, TI, Huawei, Motorola, Nokia, Samsung Noted
R1‑082663 36211 CR0052 (Rel-8, F) Correction of PUCCH index generation formula LGE, Nokia, Nokia Siemens Networks, Panasonic, Ericsson, TI, Samsung Agreed in principle
R1‑082664 Correction of n_cs(n_s) and OC/CS remapping for PUCCH formats 1/1a/1b and 2/2a/2b Texas Instruments Agreed in principle
R1‑082665 Reply LS to SA2 LS on Earthquake and Tsunami Warning System SA3, NTT DoCoMo Not treated
R1‑082666 Joint way forward on the UL ACK/NACK repetition for PUCCH Panasonic, Samsung, Huawei, Motorola Noted
R1‑082667 36211 CR0053 (Rel-8, F) on Orthogonal cover sequence for shortened PUCCH format 1a and 1b Panasonic, LGE, NextWave Wireless Agreed in principle
R1‑082668 36211 CR0054 (Rel-8, F) Correction of mapping of ACK/NAK to binary bit values LGE, Ericsson, TI Agreed in principle
R1‑082669 36212 CR0028 (Rel-8, F) Correction of mapping of ACK/NAK to binary bit values LGE, Ericsson, TI Agreed in principle
R1‑082670 Update on Physical Layer Parameters for CQI Reporting Texas Instruments Not treated
R1‑082671 Remaining issues on SRS hopping Huawei, NTT DoCoMo, Panasonic Noted
R1‑082672 36.213 CR0038R1 (Rel-8, F) Clarification on PUSCH frequency hopping procedure Samsung Revised
R1‑082673 Further clarifications on resource allocation type 0 and type 1 NEC Group Not treated
R1‑082674 36.211 Draft CR on UL Sounding RS Nokia Siemens Networks, Nokia Withdrawn
R1‑082675 36.211 CR0056 (Rel-8, F) Remaining issues on SRS hopping Huawei, NTT DoCoMo, Panasonic, Nokia Siemens Networks, Nokia Not treated
R1‑082676 LS on Change rate of physical layer parameters RAN2, Ericsson Noted
R1‑082677 25.224 CR0185R1 (Rel-7, F) on HS-SCCH and HS-SICH power control enhancement for 1.28Mcps TDD TD Tech Noted
R1‑082678 25.224 CR0186R1 (Rel-8, A) on HS-SCCH and HS-SICH power control enhancement for 1.28Mcps TDD TD Tech Noted
R1‑082679 36.212 CR0031 (Rel-8, F) Modification of M_limit Ericsson Agreed
R1‑082680 Draft CR on PDCCH search space ASUSTeK Not treated
R1‑082681 Draft Reply LS on allowing DTX on E-DPCCH Qualcomm Europe Revised
R1‑082682 Link Budget Impact due to DC-HSDPA operation Qualcomm Europe Noted
R1‑082683 Timelineof Enhanced Serving Cell change procedure Qualcomm Europe Revised
R1‑082684 Reserving an E-AI for future use Qualcomm Europe Noted
R1‑082685 Proposed update for CR to 25.211 for Enhanced Uplink for CELL_FACH state Samsung Noted
R1‑082686 Proposed update for CR to 25.214 for Enhanced Uplink for CELL_FACH state Samsung Noted
R1‑082687 Reply LS on allowing DTX on E-DPCCH Qualcomm Europe Revised
R1‑082688 25.212 CR0265R1 (Rel-7,F) Correction to the table name and the quoted name HUAWEI Noted
R1‑082689 25.212 CR0266R1 (Rel-8,A) Correction to the table name and the quoted name HUAWEI Noted
R1‑082690 On the formula for linkage between PUSCH MCS and amount of resources used for control Nortel Noted
R1‑082691 Way forward on offset signalling of PUSCH control information MCS LGE, Nokia, Nokia Siemens Networks, Huawei, Ericsson Agreed in principle
R1‑082692 36.212 CR0029 (Rel-8, F) Correction to bit collection, selection and transmission Ericsson Agreed
R1‑082693 Indication of single codeword transmission in DCI format 2 LGE, Panasonic, Ericsson, TI, NEC, Qualcomm, Nokia, Nokia Siemens Network, Samsung Noted
R1‑082694 Indication of codewords in dynamic switching from format 1A to format 2 Samsung, Texas Instrument, Motorola, NTT DoCoMo, Nortel Noted
R1‑082695 Timeline of Enhanced Serving Cell change procedure Qualcomm Europe Noted
R1‑082696 Simulation results of VoIP DL transmission for 1.28Mcps TDD CATT Noted
R1‑082697 [Draft] LS to RAN WG2 on UE Reconfiguration Timing and HS-SCCH Order Qualcomm Europe Revised
R1‑082698 LS on DC-HSDPA carrier management RAN2, Qualcomm Europe Noted
R1‑082699 36.213 CR0048 (Rel-8, F) on correction of mapping of cyclic shift value to PHICH modifier LGE, Samsung Not treated
R1‑082700 Draft DCI Format 1C way forward Motorola, LGE, Samsung, Panasonic, Huawei, … Revised
R1‑082701 25.211 CR draft (Rel-8,B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers Ericsson Agreed in principle
R1‑082702 25.212 CR draft (Rel-8,B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers Ericsson Agreed in principle
R1‑082703 25.213 CR draft (Rel-8,B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers Ericsson Agreed in principle
R1‑082704 25.214 CR draft (Rel-8,B) Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers Ericsson Agreed in principle
R1‑082705 DCI format 1C way forward Motorola, LGE, Ericsson, Qualcomm, Panasonic, Nokia, Nokia Siemens Networks, Samsung, Huawei, ALU, NTT DoCoMo, NEC Agreed
R1‑082706 Draft LS reply on Semi-Persistent Scheduling Activation with single PDCCH Qualcomm Europe, Samsung, Panasonic, Philips, NXP, Alcatel-Lucent, InterDigital, Motorola Noted - Revised
R1‑082707 UL SU-MIMO for E-UTRA Texas Instruments Noted
R1‑082708 Extended PCI set for CSG cells Infineon Technologies Not treated
R1‑082709 36.212 CR0030 (Rel-8, F) Padding one bit to DCI format 1 when format 1 and format 0/1A have the same size NEC Group, LGE, Ericsson, Nokia, Nokia Siemens Networks, Alcatel-Lucent, Nortel, Texas Instruments, Motorola, Samsung, Broadcom, Philips, Huawei Agreed
R1‑082710 Draft Skeleton TR on Further Advancements for E-UTRA Physical Layer Aspects (Release 8) Rapporteur Endorsed
R1‑082711 36.211 CR0046R2 (Rel-8, F) Rank scrambling in PUSCH Samsung, LGE, Nokia, Nokia Siemens Networks Not treated
R1‑082712 36.212 CR0027R1 (Rel-8, F) Rank scrambling in PUSCH Samsung, LGE, Nokia, Nokia Siemens Networks Not treated
R1‑082713 New evaluation models (microcell, Indoor, Rural/High speed) Rapporteur Noted
R1‑082714 Correction to the downlink resource allocation LG Electronics, Alcatel-Lucent, Motorola, Samsung, NEC Noted
R1‑082715 36211 CR0052R1 (Rel-8, F) Correction of PUCCH index generation formula LGE, Nokia, Nokia Siemens Networks, Panasonic, Ericsson, TI, Samsung Not treated
R1‑082716 36.212 CR0032 (Rel-8, F) Definition of Formats 2 and 2A Panasonic Agreed
R1‑082717 36.213 CR0049 (Rel-8, F) TBS disabling for DCI formats 2 and 2A Panasonic Agreed
R1‑082718 36.211 CR0055 (Rel-8, F) Correction of the PRACH resource location Ericsson Not treated
R1‑082719 Remaining Issues with TBS & MCS Settings Ericsson, Panasonic, Motorola, LGE, NEC, Samsung, Nokia, Nokia Siemens Networks Noted
R1‑082720 36.213 CR0050 (Rel-8, F) Correction of maximum TBS sizes Ericsson Agreed
R1‑082721 36.212 CR0033 (Rel-8, F) Corrections to DCI formats Philips, NXP Not treated
R1‑082722 36.212 CR0025R1 (Rel-8, F) Simplified formula for linking control resources in PUSCH to PUSCH MCS - Withdrawn
R1‑082723 Text proposal for RAN1 TR on LTE-Advanced Rapporteur Endorsed
R1‑082724 Further clarifications on confirmation field in DCI format 2 LG Electronics, NEC, Qualcomm, Philips, Samsung, Ericsson Agreed in principle
R1‑082725 36.213 CR0038R2 (Rel-8, F) Clarification on PUSCH frequency hopping procedure Samsung Revised
R1‑082726 CQI reference measurement period Philips, NXP Noted
R1‑082727 CQI for UE-specific RS Philips, NXP Noted
R1‑082728 CQI definition for MU-MIMO Philips, NXP Not treated
R1‑082729 Summary of the session on TS36.212 Ad Hoc Chair Noted
R1‑082730 36.212 CR0034 (Rel-8, F) Linking of control resources in PUSCH to data MCS Samsung, Panasonic, LGE Agreed in principle
R1‑082731 Joint way forward on the ACK/NACK scrambling for PUCCH Panasonic, Samsung, Texas Instruments, NTT DOCOMO, Mitsubishi, KDDI, Sharp, Fujitsu Noted
R1‑082732 Reference for CQI/PMI Reporting Offset Texas Instruments, NEC, Ericsson, Huawei Noted
R1‑082733 Response LS on change rate of physical layer parameters Ericsson Revised
R1‑082734 Introducing missing L1 parameters into 36.213 Ericsson Not treated
R1‑082735 Way forward on the PRACH frequency offset Panasonic, LGE, Motorola, Nokia, Nokia Siemens Networks, NTT DoCoMo, Samsung, TI Not treated
R1‑082736 36.212 CR0035 (Rel-8, F) PDCCH format 1B Qualcomm Europe Agreed
R1‑082737 Draft LS on PRACH preamble power offset LGE Not treated
R1‑082738 Way forward on UE specific SRS configuration TI, Samsung, CATT, RITT, ZTE, Qualcomm, CMCC, Huawei Not treated
R1‑082739 Way forward on support of ACK/NACK repetition TI, Nokia Siemens Networks, Nokia, LGE, Samsung, ZTE Not treated
R1‑082740 Further clarification on precoding confirmation NEC Group, LGE Not treated
R1‑082741 Way Forward on the remaining issues for ACK/NAK Bundling Nokia, CATT, Ericsson, Huawei, LGE, Motorola, Nokia Siemens Networks, Qualcomm, Samsung, Texas Instruments, ZTE, CMCC Not treated
R1‑082742 Way Forwaed on PUSCH DTX detection Nokia Siemens Networks, Ericsson, ETRI, Huawei, Mitsubishi, NEC, Nokia, NTT DoCoMo Noted
R1‑082743 Way Forward for PUCCH ACK/NACK resource compression in TDD LGE, Ericsson, Motorola, Nokia, Huawei, Sansung, TI, Nokia Siemens Networks Not treated
R1‑082744 Way forward for baseline for discussion on PUSCH control information offsets LG Electronics, Panasonic Not treated
R1‑082745 36.213 CR0038R3 (Rel-8, F) Clarification on PUSCH frequency hopping procedure Samsung Withdrawn
R1‑082746 36.211 CR0057 (Rel-8, F) Correction of n_cs(n_s) and OC/CS remapping for PUCCH formats 1/1a/1b and 2/2a/2b Texas Instruments, Samsung, Panasonic, ZTE, LGE Not treated
R1‑082747 Summary of options to extend the PCI space Qualcomm Europe, Panasonic Noted
R1‑082748 LS reply on CSG cell identification Qualcomm Europe Revised
R1‑082749 25.214 CR0498 (Rel-8,B) Introduction of HS-PDSCH Serving Cell Change Enhancements Ericsson, Qualcomm Europe Noted
R1‑082750 Discussion on RSN for BCCH message Huawei Missing
R1‑082751 LS response to LS on Information about new PDCCH Format 1C & LS on SI scheduling Huawei, Motorola, Qualcomm Noted
R1‑082752 Way Forward on multiple ACK/NACK for LTE TDD CATT, CMCC, Ericsson, Huawei, Nokia, Nokia Siemens Networks, Qualcomm, LGE, Samsung, TI, ZTE, Motorola Not treated
R1‑082753 Baseline TP for PUSCH Control Information offset LGE Not treated
R1‑082754 Way Forward on maximum SRS Bandwidth for UpPTS CATT, CMCC, Huawei, Motorola, Nokia, Nokia Siemens Networks, RITT, ZTE Not treated
R1‑082755 Draft CR to 36.211 Sounding maximum bandwidth for UpPTS CATT, CMCC, Huawei, Motorola, RITT, ZTE Not treated
R1‑082756 Way Forward on UL ACK repetition Qualcomm, Ericsson Not treated
R1‑082757 LS on DCI Format 1C on MCS and Resource Allocation Motorola Revised
R1‑082758 SI-X tables Motorola Missing
R1‑082759 Reply LS on allowing DTX on E-DPCCH Qualcomm Europe Agreed
R1‑082760 Draft LS reply on Semi-Persistent Scheduling Activation with single PDCCH Qualcomm Europe, Samsung, Panasonic, Philips, NXP, Alcatel-Lucent, InterDigital, Motorola, Huawei Revised
R1‑082761 Response LS on change rate of physical layer parameters RAN1, Ericsson Agreed
R1‑082762 LS reply on CSG cell identification RAN1, Qualcomm Europe, Panasonic Agreed
R1‑082763 LS to RAN WG2 on UE Reconfiguration Timing and HS-SCCH Order RAN1, Qualcomm Europe Agreed
R1‑082764 LS on DCI Format 1C on MCS and Resource Allocation RAN1, Motorola Agreed
R1‑082765 LS Response to LS on synchronization of L1 parameter from system information RAN1, Panasonic Agreed
R1‑082766 LS Response to Semi-Persistent Scheduling Activation with Single PDCCH RAN1, Qualcomm Europe Agreed

page generated from database: 2024-04-13 13:51:47

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links