3GPP TDocs (written contributions) at meeting
Meeting: C3-54 - 2009-08-24 to 2009-08-28, Seville
meeting id: C3-54 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C3‑090784 | Draft Agenda for CT3#54 | CT3 Chair | Approved |
C3‑090785 | Allocation of documents to agenda items (at deadline) | CT3 Chair | Noted |
C3‑090786 | Allocation of documents to agenda items (start of Day1) | CT3 Chair | Noted |
C3‑090787 | Allocation of documents to agenda items (start of Day2) | CT3 Chair | Noted |
C3‑090788 | Wrong Tdoc Allocation | MCC | Withdrawn |
C3‑090789 | Allocation of documents to agenda items (start of Day3) | CT3 Chair | Noted |
C3‑090790 | Allocation of documents to agenda items (start of Day4) | CT3 Chair | Noted |
C3‑090791 | Allocation of documents to agenda items (start of Day5) | CT3 Chair | Noted |
C3‑090792 | Allocation of documents to agenda items (end of Day5) | CT3 Chair | Noted |
C3‑090793 | Draft Report from CT3#52 | MCC | Approved |
C3‑090794 | Latest Version of 3GPP Workplan | MCC | Noted |
C3‑090795 | Status of CT3 specifications following CT#44 meeting | MCC | Postponed |
C3‑090796 | Meeting Calendar for 2009 | MCC | Noted |
C3‑090797 | Enhancements for Communication Waiting Supplementary Service | 3GPP TSG CT WG1 | Noted |
C3‑090798 | Reply LS on MBMS Improvement for HSPA Evolution | TSG CT WG4 | Noted |
C3‑090799 | LS on "Local Call Local Switch" | TSG CT WG4 | Noted |
C3‑090800 | LS on IMEI use in SR-VCC Emergency | 3GPP TSG CT4 | Postponed |
C3‑090801 | LS on mapping access types | TSG CT WG4 | Noted |
C3‑090802 | Reply LS on "Local Call Local Switch" | TSG GERAN WG2 | Noted |
C3‑090803 | LS on "Local Call Local Switch" | TSG GERAN WG2 | Noted |
C3‑090804 | LS to 3GPP CT3 on improved IMS-CS video interworking with MONA SPC | ITU-T SG16 | Noted |
C3‑090805 | LS to 3GPP CT WG3 and WG4 on progress on ITU-T H.248 packages for MONA support | ITU-T SG 16 -Q3/16 | Noted |
C3‑090806 | LS on resolution of MBMS for HSPA evolution | TSG RAN WG3 | Noted |
C3‑090807 | Reply LS on PGW Charging for PMIP based S5/S8 – “Charging ID” | TSG SA WG2 | Noted |
C3‑090808 | Reply LS on Signalling based trace (de)activation to PDN GW when using PMIP based S5/S8 interface | TSG SA WG2 | Noted |
C3‑090809 | LS on IMEI use in SR-VCC Emergency | TSG SA WG2 | Noted |
C3‑090810 | Reply LS on Clarification about the TFT and PCC packet filters | TSG SA WG2 | Noted |
C3‑090811 | Reply LS on security aspects of new work item "RTTI support in IMS charging" | TSG SA WG3 | Noted |
C3‑090812 | LS on IMS media plane security | TSG SA WG3 | Noted |
C3‑090813 | LS on 3GPP2 User location parameter availability in the P-GW for Charging purpose | TSG SA WG5 | Noted |
C3‑090814 | LS on OCS acting as a PCC Application Function | TSG SA WG5 | Noted |
C3‑090815 | LS on eMBMS charging differentiation based on E-UTRAN and/or UTRAN | TSG SA WG5 | Postponed |
C3‑090816 | LS on "Local Call Local Switch" | TSG SA WG3LI | Noted |
C3‑090817 | Major capabilities on II-NNI | Telecom Italia | merged with 898 into 1015 |
C3‑090818 | TS 29.612, Version 8.0.0 | MCC | Postponed |
C3‑090819 | Brief Notes from CT#44 relevant to CT3 | CT3 Chairman | Noted |
C3‑090820 | Proposed Schedule for CT3#54 | CT3 Chairman | Revised in 1088 |
C3‑090821 | Reply LS on IMS-CS video interworking with MONA SPC | Ericsson | Approved |
C3‑090822 | Correcting references to H.324 | Ericsson | Revised in 986 |
C3‑090823 | Correcting references to H.324 | Ericsson | Revised in 987 |
C3‑090824 | Deferred leg linking indicator in Gxx | Ericsson | Revised in 1048 |
C3‑090825 | Deferred leg session linking handling | Ericsson | Revised in 1049 |
C3‑090826 | Deferred leg session linking handling when roaming | Ericsson | Agreed |
C3‑090827 | Supported-Features AVP handling in Gx | Ericsson | Revised in 1062 |
C3‑090828 | Indication of QoS reservation result over Gx and Gxx | Ericsson | Revised in 1063 |
C3‑090829 | APN-AMBR in S9 | Ericsson | Revised in 1086 |
C3‑090830 | Dual IP address allocation | Ericsson | Revised in 1064 |
C3‑090831 | ARP priority level values in intra-operator domain | Ericsson | Revised in 1050 |
C3‑090832 | ARP priority level values in intra-operator domain | Ericsson | Revised in 1051 |
C3‑090833 | Usage Reporting in Gx | Ericsson | Revised in 1100 |
C3‑090834 | Usage Reporting in S9 | Ericsson | Postponed |
C3‑090835 | BCM in Gxx for 3gpp accesses | Ericsson | Revised in 1055 |
C3‑090836 | BCM handling in the flows | Ericsson | Revised in 1056 |
C3‑090837 | AVP code Reassignment | Ericsson | Revised in 1065 |
C3‑090838 | LS out for allocating Diameter AVP codes | Ericsson | Approved |
C3‑090839 | IMS Emergency Services | Ericsson | Revised in 1092 |
C3‑090840 | Emergency services not supported in S9 | Ericsson | Revised in 1093 |
C3‑090841 | Correction for 3GPP2 AVP BSID | Starent Networks Alcatel-Lucent Corporation, | Agreed |
C3‑090842 | Using 3GPP2 Defined AVPs | Starent Networks Corporation, | Noted |
C3‑090843 | Request to 3GPP2 to Assign 3GPP2 Diameter AVP 3GPP2-BSID | Starent Networks Corporation, | Revised in 1036 |
C3‑090844 | New SID on PCRF Failure and Restoration | NEC, Bridgewater Systems, Telecom Italia, Huawei | Revised in 1032 |
C3‑090845 | Skeleton for TR 29.8yz (Study on PCRF failure and restoration) | NEC | Revised in 1033 |
C3‑090846 | Scope for TR 29.8yz | NEC | Revised in 1034 |
C3‑090847 | PCRF Failure scenarios | NEC | Revised in 1035 |
C3‑090848 | PCRF Failure and restoration functional requirements for solutions | NEC | Noted |
C3‑090849 | Fix the redirect procedure over the Gx interface | NEC, NTT DOCOMO | Agreed |
C3‑090850 | Usage Monitoring Control over Gx | Camiant | merged into C3-091100 |
C3‑090851 | Update to IBCF TrGW Interaction, Bandwidth Policing | Ericsson | Revised in 1007 |
C3‑090852 | Addition of Release TrGW Termination to IMS-IBCF procedures | Ericsson | Revised in 1008 |
C3‑090853 | RTTI Schema corrections | Ericsson | Postponed |
C3‑090854 | MCID interaction at the NNI | Ericsson | Revised in 1000 |
C3‑090855 | Correction of the mapping of PSTN XML body with ISUP parameters to ACM, REL and CON | Ericsson | Agreed |
C3‑090856 | IMSI attach | Ericsson | Revised in 1005 |
C3‑090857 | Mandatory Support of properties in TrGW and IMS-AGW | Ericsson | Noted |
C3‑090858 | Addition of Release TrGW Termination to CS-IBCF procedures | Ericsson | Revised in 997 |
C3‑090859 | Minor correction to A.7.1.2.2.5 | Ericsson | Agreed |
C3‑090860 | Addition of IP Interface Type to CS-IBCF procedures | Ericsson | Revised in 998 |
C3‑090861 | Update to CS-IBCF TrGW Interaction, Bandwidth Policing | Ericsson | Revised in 999 |
C3‑090862 | Text relates to wrong call direction | Ericsson, Nokia Siemens Networks | Agreed |
C3‑090863 | Text relates to wrong call direction | Ericsson, Nokia Siemens Networks | Agreed |
C3‑090864 | Text relates to wrong message direction | Ericsson, Nokia Siemens Networks | Agreed |
C3‑090865 | Text relates to wrong message direction | Ericsson, Nokia Siemens Networks | Agreed |
C3‑090866 | New WID on PCC | Huawei, Orange, Qualcomm Europe, ZTE, T-Mobile | Revised in 1096 |
C3‑090867 | Supporting multiple PDN connection to same APN(R9 29.212) | Huawei | Revised in 1021 |
C3‑090868 | Supporting multiple PDN connection to same APN(R9 29.213) | Huawei | Revised in 1022 |
C3‑090869 | Supporting multiple PDN connection to same APN(R9 29.215) | Huawei | Revised in 1160 |
C3‑090870 | Alignment of TFT and PCC packet filters(R7 29.212) | Huawei | Revised in 995 |
C3‑090871 | Alignment of TFT and PCC packet filters(R8 29.212) | Huawei | Revised in 1042 |
C3‑090872 | Adding the missed AVP in the RAA(R7 29.212) | Huawei | Revised in 996 |
C3‑090873 | Adding the missed AVP in the RAA(R8 29.212) | Huawei | Revised in 1067 |
C3‑090874 | Removing multiple Charging-Rule-Remove AVP in RAR CCA(R7 29.212) | Huawei | Withdrawn |
C3‑090875 | Removing multiple Charging-Rule-Remove AVP in RAR CCA(R8 29.212) | Huawei | Withdrawn |
C3‑090876 | Limited PCC deployment(R8 29.214) | Huawei | merged into C3-0901068 |
C3‑090877 | Correction of the AVP code(R8 29.212) | Huawei | merged into C3-091065 |
C3‑090878 | ARP Handling When UE-init Bearer Modification(R8 29.212) | Huawei | Revised in 1070 |
C3‑090879 | Correction that BCM is sent over Gxx only for non-3GPP access(R8 29.212) | Huawei | merged into C3-0901055 |
C3‑090880 | Correction that BCM is sent over Gxx only for non-3GPP access(R9 29.212) | Huawei | Withdrawn |
C3‑090881 | Correction that BCM is sent over Gxx only for non-3GPP access(R8 29.213) | Huawei | merged into C3-0901056 |
C3‑090882 | Correction that BCM is sent over Gxx only for non-3GPP access(R9 29.213) | Huawei | Withdrawn |
C3‑090883 | Adding MBMS Session Start Procedure for EPS (R9 29.061) | Huawei | merged into C3-091082 |
C3‑090884 | Adding MBMS Session Stop Procedure for EPS(R9 29.061) | Huawei | merged into C3-091082 |
C3‑090885 | ARP for emergency service(R9 29.212) | Huawei | merged into C3-091092 |
C3‑090886 | Clarification for the Gxx Gx linking(R9 29.212) | Huawei | Revised in 1094 |
C3‑090887 | Clarification for emergency services(R9 29.213) | Huawei | Revised in 1095 |
C3‑090888 | Correcting erroneous location in subclauses 5.3.8, 5.4.8.2 and 5.6.4.5 | Ericsson | Agreed |
C3‑090889 | Sending CANCEL or BYE correction in subclause 5.3.9 | Ericsson | Withdrawn |
C3‑090890 | CW removing unecessary procedure in 5.6.4.3 and 5.6.4.5 | Ericsson | Revised in 1006 |
C3‑090891 | CW Stopping the timer TUE-CW when accepting the waiting call clarification in subclause 5.6.4.2 | Ericsson | Agreed |
C3‑090892 | PCRF Handling of Emergency Call Back | Alcatel-Lucent | Withdrawn |
C3‑090893 | PCEF Handling of Emergency Call Back | Alcatel-Lucent | Revised in 1040 |
C3‑090894 | PCEF Inactivity Timer | Alcatel-Lucent | Withdrawn |
C3‑090895 | PCRF Initiated Non-Primary BBERF GW Control Session Termination | Alcatel-Lucent | Noted |
C3‑090896 | Clarification on S9 Transport Layer Protocol | NTT DOCOMO, Huawei, Orange, Vodafone | Agreed |
C3‑090897 | Applying emergency service to non-Emergency APN(R9 29.214) | Huawei | Postponed |
C3‑090898 | Major Capabilities on II-NNI | Orange | merged with 817 into 1015 |
C3‑090899 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V1) | Orange | Revised in 1018 |
C3‑090900 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V2) | Orange | Withdrawn |
C3‑090901 | Requirements for the end-to-end interoperability of supplementary services | Orange | Revised in 1019 |
C3‑090902 | Reminder on the scope of the II-NNI specification | Orange | Noted |
C3‑090903 | Deletion of the note about the normalization of phone numbers | Orange | Revised in 1099 |
C3‑090904 | Rx Support for Emergency Call Back Indication | Alcatel-Lucent | Withdrawn |
C3‑090905 | Harmonisation of QoS and APN-AMBR parameters | Starent Networks | Withdrawn |
C3‑090906 | Harmonisation of QoS and APN-AMBR parameters | Starent Networks | Withdrawn |
C3‑090907 | Failure Handling | Starent Networks | Postponed |
C3‑090908 | Session Failover | Starent Networks | Postponed |
C3‑090909 | PCC rule modification failure handling | Qualcomm Europe | Withdrawn |
C3‑090910 | PCC/QoS rule modification failure handling | Qualcomm Europe | Postponed |
C3‑090911 | Corrections for PCC/QoS rule modification failure | Qualcomm Europe | Withdrawn |
C3‑090912 | Corrections for PCC/QoS rule modification failure | Qualcomm Europe | Withdrawn |
C3‑090913 | IP-CAN type determination and leg linking | Qualcomm Europe | Noted |
C3‑090914 | Corrections on setting of IP-CAN type value | Qualcomm Europe | merged into C3-0901072 |
C3‑090915 | Aligning with 24.292 | Research in Motion | Revised in 1016 |
C3‑090916 | Aligning IANA registration of MIME type "application/vnd.etsi.sci+xml" | Research in Motion | Revised in 1017 |
C3‑090917 | Access technology types | Nokia Siemens Networks | merged into C3-091072 |
C3‑090918 | Trace (de)activation at P-GW | Nokia Siemens Networks | Revised in 1073 |
C3‑090919 | UE time zone | Nokia Siemens Networks | merged into C3-0901074 |
C3‑090920 | AVP codes | Nokia Siemens Networks | Agreed |
C3‑090921 | Editorial correction to Gmb interface | ZTE | Revised in 1076 |
C3‑090922 | Editorial correction to Gmb interface | ZTE | Revised in 1077 |
C3‑090923 | General definition and description for MBMS support in EPS | ZTE | Revised in 1079 |
C3‑090924 | Interworking with BM-SC in EPS | ZTE | Revised in 1080 |
C3‑090925 | The skeleton of SGmb interface clause | ZTE | Revised in 1078 |
C3‑090926 | General description of MBMS session start/update/stop procedure | ZTE | Revised in 1081 |
C3‑090927 | Message flows of SGmb interface | ZTE | Revised in 1082 |
C3‑090928 | SGmb message | ZTE | Revised in 1083 |
C3‑090929 | SGmb specific AVPs | ZTE | Revised in 1084 |
C3‑090930 | SGmb re-used AVPs | ZTE | Revised in 1085 |
C3‑090931 | Error handling in authorized QoS enforcement | ZTE | Revised in 1089 |
C3‑090932 | Error handling in authorized QoS enforcement | ZTE | Revised in 1090 |
C3‑090933 | Add the implementation of gateway control and QoS rules request for visited access | ZTE | Revised in 1057 |
C3‑090934 | Clarification of the description about IP-CAN session establishment | ZTE | merged into C3-0901056 |
C3‑090935 | General editorial cleanups | ZTE | Revised in 1058 |
C3‑090936 | Handling of multiple BBERF about new gateway control session establishment for visited access | ZTE | Revised in 1052 |
C3‑090937 | Handling of multiple BBERF about PCEF-Initiated IP-CAN session modification for visited access | ZTE | Revised in 1053 |
C3‑090938 | Modification of PCRF-Initiated Gateway Control Session Termination procedure | ZTE | Revised in 1059 |
C3‑090939 | Modification of the description for the S2c case exmaple in GC session procedures | ZTE | Revised in 1060 |
C3‑090940 | Modification of the S9 implementation of gateway control and QoS rules provision | ZTE | Revised in 1121 |
C3‑090941 | Modification of the S9 implementation of gateway control and QoS rules request | ZTE | Revised in 1061 |
C3‑090942 | PCEF-initiated IP-CAN Session modification in Non-Roaming and Home-routed | ZTE | Revised in 1133 |
C3‑090943 | PCEF-initiated IP-CAN Session modification in visited access | ZTE | Revised in 1134 |
C3‑090944 | Correction to the BCM selection on Gxx | ZTE | merged into C3-0901055 |
C3‑090945 | Correction to the table of Gxx re-used AVPs | ZTE | Revised in 1075 |
C3‑090946 | Handling of multiple BBERF | ZTE | Revised in 1054 |
C3‑090947 | Report the UE time zone information to the PCRF | ZTE, Huawei | Revised in 1074 |
C3‑090948 | Report the limited PCC deployment to the AF | ZTE | merged into C3-0901068 |
C3‑090949 | Handling of multiple BBERF | ZTE | Revised in 1091 |
C3‑090950 | Resolve the conflict of event trigger descriptions | ZTE | Revised in 1087 |
C3‑090951 | PCC Support for 3GPP2 cdma1x and HRPD | ZTE | Revised in 1072 |
C3‑090952 | The PCEF reports the usage information to the PCRF | ZTE | Postponed |
C3‑090953 | The SPR stores usage allowance in the IP-CAN session termination flows | ZTE | Postponed |
C3‑090954 | Report the limited PCC deployment to the AF | ZTE | Revised in 1069 |
C3‑090955 | Modification of the description on session linking for the MUPSAP scenario | ZTE | merged into C3-091021 |
C3‑090956 | Addition of PDN connection ID in the Gateway Control Session Establishment | ZTE | merged into C3-091021 |
C3‑090957 | The AVP of PDN Connection ID | ZTE | merged into C3-091021 |
C3‑090958 | Addition of the parameter description of PDN connection id for the Gateway Control Session Establishment procedure | ZTE | merged into C3-091022 |
C3‑090959 | Corrections to Table 12 | ZTE | Withdrawn |
C3‑090960 | Corrections to Table 12 | ZTE | Withdrawn |
C3‑090961 | Corrections to Table 12 | ZTE | Withdrawn |
C3‑090962 | Removal of left-over text from TS drafting phase and update of a reference | Nokia Siemens Networks | Revised in 1001 |
C3‑090963 | Applicability of SIP headers for roaming II-NNI | Nokia Siemens Networks | Revised in 1002 |
C3‑090964 | Application level gateway usage to enable communication from private IP address space | Nokia Siemens Networks | Revised in 1003 |
C3‑090965 | Codecs at the NNI | Nokia Siemens Networks | Revised in 1004 |
C3‑090966 | PCC support of the Early Session Disposition Type | Nokia Siemens Networks | Noted |
C3‑090967 | PCC handling of SDP of early session disposition type | Nokia Siemens Networks | Withdrawn |
C3‑090968 | PCC handling of SDP of early session disposition type | Nokia Siemens Networks | Withdrawn |
C3‑090969 | Handling of RTCP Streams | Nokia Siemens Networks | Revised in 1009 |
C3‑090970 | Use of Media Information at TrGW not supporting transcoding | Nokia Siemens Networks | Revised in 1010 |
C3‑090971 | Termination ID in responses optional | Nokia Siemens Networks | Withdrawn |
C3‑090972 | Notification of released bearer | Nokia Siemens Networks | Revised in 1011 |
C3‑090973 | Use of Media Information at TrGW not supporting transcoding | Nokia Siemens Networks | Withdrawn |
C3‑090974 | Termination ID in responses optional | Nokia Siemens Networks | Withdrawn |
C3‑090975 | Notification of released bearer | Nokia Siemens Networks | Revised in 1012 |
C3‑090976 | PCC handling of SDP of early session disposition type | Nokia Siemens Networks | Postponed |
C3‑090977 | PCC handling of SDP of early session disposition type | Nokia Siemens Networks | Postponed |
C3‑090978 | Remote Resources in responses optional | Nokia Siemens Networks | Agreed |
C3‑090979 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 982 |
C3‑090980 | Remote Resources in responses optional | Nokia Siemens Networks | Agreed |
C3‑090981 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 984 |
C3‑090982 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 985 |
C3‑090983 | TS 29.612 is not required | Nokia Siemens Networks | Noted |
C3‑090984 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 1014 |
C3‑090985 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 1013 |
C3‑090986 | Correcting references to H.324 | Ericsson | Agreed |
C3‑090987 | Correcting references to H.324 | Ericsson | Agreed |
C3‑090988 | LS to 3GPP CT3 and CT4 on Diameter Roaming Interfaces | RILTE (Roaming in LTE) | Noted |
C3‑090989 | LS on H.245 Flow Control Command | TSG SA WG4 | Noted |
C3‑090990 | Reply LS to Enhancements for Communication Waiting Supplementary Service | ALU | Revised in 1037 |
C3‑090991 | Reply LS on LS on mapping access types | - | Revised in 1114 |
C3‑090992 | Reply LS to LS to 3GPP CT3 on improved IMS-CS video interworking with MONA SPC | CT3 | Withdrawn |
C3‑090993 | Reply LS on 3GPP2 User location parameter availability in the P-GW for charging purpose | CT3 | Revised in 1038 |
C3‑090994 | Reply LS on H.245 Flow Control Command | Thomas | Revised in 1043 |
C3‑090995 | Alignment of TFT and PCC packet filters(R7 29.212) | Huawei | Revised in 1041 |
C3‑090996 | Adding the missed AVP in the RAA | Huawei | Agreed |
C3‑090997 | Addition of Release TrGW Termination to CS-IBCF procedures | Ericsson | Agreed |
C3‑090998 | Addition of IP Interface Type to CS-IBCF procedures | Ericsson | Revised in 1044 |
C3‑090999 | Update to CS-IBCF TrGW Interaction, Bandwidth Policing | Ericsson | Postponed |
C3‑091000 | MCID interaction at the NNI | Ericsson | Revised in 1045 |
C3‑091001 | Removal of left-over text from TS drafting phase and update of a reference | Nokia Siemens Networks | Agreed |
C3‑091002 | Applicability of SIP headers for roaming II-NNI | Nokia Siemens Networks | Revised in 1047 |
C3‑091003 | Application level gateway usage to enable communication from private IP address space | Nokia Siemens Networks | Agreed |
C3‑091004 | Codecs at the NNI | Nokia Siemens Networks | Revised in 1102 |
C3‑091005 | IMSI attach | Ericsson | Revised in 1104 |
C3‑091006 | CW removing unecessary procedure in 5.6.4.3 and 5.6.4.5 | Ericsson | withdrawn |
C3‑091007 | Update to IBCF TrGW Interaction, Bandwidth Policing | Ericsson | postponed |
C3‑091008 | Addition of Release TrGW Termination to IMS-IBCF procedures | Ericsson | Agreed |
C3‑091009 | Handling of RTCP Streams | Nokia Siemens Networks | Revised in 1105 |
C3‑091010 | Use of Media Information at TrGW not supporting transcoding | Nokia Siemens Networks | Revised in 1106 |
C3‑091011 | Notification of released bearer | Nokia Siemens Networks | Agreed |
C3‑091012 | Notification of released bearer | Nokia Siemens Networks | Revised in 1107 |
C3‑091013 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 1108 |
C3‑091014 | Media Inactivity Detection | Nokia Siemens Networks | Revised in 1109 |
C3‑091015 | Major capabilities on II-NNI | Telecom Italia, Orange | Revised in 1110 |
C3‑091016 | Aligning with 24.292 | Research in Motion | Agreed |
C3‑091017 | Aligning IANA registration of MIME type "application/vnd.etsi.sci+xml" | Research in Motion | Revised in 1020 |
C3‑091018 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V1) | Orange | Revised in 1046 |
C3‑091019 | Requirements for the end-to-end interoperability of supplementary services | Telecom Italia, Orange | Revised in 1111 |
C3‑091020 | Aligning IANA registration of MIME type "application/vnd.etsi.sci+xml" | Research in Motion | Agreed |
C3‑091021 | Supporting multiple PDN connection to same APN | Huawei | Revised in 1159 |
C3‑091022 | Supporting multiple PDN connection to same APN(R9 29.213) | Huawei, ZTE | Revised in 1163 |
C3‑091023 | General description of MBMS session start/update/stop procedure | ZTE | Agreed |
C3‑091024 | Message flows of SGmb interface | ZTE, Huawei | Revised in 1137 |
C3‑091025 | SGmb message | ZTE | Revised in 1138 |
C3‑091026 | SGmb re-used AVPs | ZTE | Agreed |
C3‑091027 | ARP priority level values in intra-operator domain | Ericsson | Agreed |
C3‑091028 | ARP priority level values in intra-operator domain | Ericsson | Agreed |
C3‑091029 | Handling of multiple BBERF in PCEF-Initiated IP-CAN session modification for visited access | ZTE | Revised in 1101 |
C3‑091030 | Proposed Schedule for CT3#54 | CT3 Chairman | Noted |
C3‑091031 | 3GPP2-BSID over Gx | Alcatel-Lucent | Revised in 1039 |
C3‑091032 | New SID on PCRF Failure and Restoration | NEC, Bridgewater Systems, Telecom Italia, Huawei, NTT DOCOMO, NTT, Alcatel-Lucent | Revised in 1157 |
C3‑091033 | Skeleton for TR 29.8yz (Study on PCRF failure and restoration) | NEC | Agreed |
C3‑091034 | Scope for TR 29.8yz | NEC | Revised in 1158 |
C3‑091035 | PCRF Failure scenarios | NEC | Agreed |
C3‑091036 | Request to 3GPP2 to Assign 3GPP2 Diameter AVP 3GPP2-BSID | Starent Networks Corporation, | Revised in 1144 |
C3‑091037 | Reply LS Enhancements for Communication Waiting Supplementary Service | ALU | Revised in 1142 |
C3‑091038 | Reply LS on 3GPP2 User location parameter availability in the P-GW for charging purpose | - | Revised in 1115 |
C3‑091039 | 3GPP2-BSID over Gx | Alcatel-Lucent | Revised in 1127 |
C3‑091040 | PCEF Handling of Emergency Call Back | Alcatel-Lucent | Revised in 1129 |
C3‑091041 | Alignment of TFT and PCC packet filters | Huawei | Agreed |
C3‑091042 | Alignment of TFT and PCC packet filters(R8 29.212) | Huawei | Agreed |
C3‑091043 | Reply LS on H.245 Flow Control Command | Thomas | Revised in 1143 |
C3‑091044 | Addition of IP Interface Type to CS-IBCF procedures | Ericsson | Agreed |
C3‑091045 | MCID interaction at the NNI | Ericsson | Revised in 1113 |
C3‑091046 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V1) | Orange | Revised in 1162 |
C3‑091047 | Applicability of SIP headers for roaming II-NNI | Nokia Siemens Networks | Agreed |
C3‑091048 | Deferred leg linking indicator in Gxx | Ericsson | Agreed |
C3‑091049 | Deferred leg session linking handling | Ericsson | Revised in 1116 |
C3‑091050 | ARP priority level values in intra-operator domain | Ericsson | Revised in 1027 |
C3‑091051 | ARP priority level values in intra-operator domain | Ericsson | Revised in 1028 |
C3‑091052 | Handling of multiple BBERF about new gateway control session establishment for visited access | ZTE | Revised in 1117 |
C3‑091053 | Handling of multiple BBERF in PCEF-Initiated IP-CAN session modification for visited access | ZTE | Revised in 1029 |
C3‑091054 | Handling of multiple BBERF | ZTE | Agreed |
C3‑091055 | BCM in Gxx for 3gpp accesses | Ericsson, Huawei, ZTE | Agreed |
C3‑091056 | BCM handling in the flows | Ericsson | Agreed |
C3‑091057 | Add the implementation of gateway control and QoS rules request for visited access | ZTE | Revised in 1119 |
C3‑091058 | General error-correction | ZTE | Revised in 1120 |
C3‑091059 | Modification of PCRF-Initiated Gateway Control Session Termination procedure | ZTE | Agreed |
C3‑091060 | Modification of the description for the S2c case exmaple in GC session procedures | ZTE | Agreed |
C3‑091061 | Modification of the S9 implementation of gateway control and QoS rules request | ZTE | Revised in 1122 |
C3‑091062 | Supported-Features AVP handling in Gx | Ericsson | Revised in 1147 |
C3‑091063 | Indication of QoS reservation result over Gx and Gxx | Ericsson | Revised in 1123 |
C3‑091064 | Dual IP address allocation | Ericsson | Agreed |
C3‑091065 | AVP code Reassignment | Ericsson, Huawei | Agreed |
C3‑091066 | Answer LS on "Local Call Local Switch" | TSG SA WG1 | Noted |
C3‑091067 | Adding the missed AVP in the RAA | Huawei | Agreed |
C3‑091068 | Limited PCC Deployment | Huawei, ZTE | Agreed |
C3‑091069 | Report the limited PCC deployment to the AF | ZTE | Revised in 1124 |
C3‑091070 | ARP Handling When UE-init Bearer Modification(R8 29.212) | Huawei | Postponed |
C3‑091071 | Revised WID on the support for Emergency Call over GPRS and EPS | Alcatel-Lucent | Endorsed |
C3‑091072 | PCC Support for 3GPP2 cdma1x and HRPD | ZTE | Postponed |
C3‑091073 | Trace (de)activation at P-GW | Nokia Siemens Networks | Revised in 1125 |
C3‑091074 | Report the UE time zone information to the PCRF | ZTE, Huawei, Nokia Siemens Networks | Agreed |
C3‑091075 | Correction to the table of Gxx re-used AVPs | ZTE | Agreed |
C3‑091076 | Correction to the IP address version of MBMS-GGSN-IPv6-Address AVP and MBMS-BMSC-SSM-IPv6-Address AVP | ZTE | Agreed |
C3‑091077 | Correction to the IP address version of MBMS-GGSN-IPv6-Address AVP and MBMS-BMSC-SSM-IPv6-Address AVP | ZTE | Agreed |
C3‑091078 | The skeleton of SGmb interface clause | ZTE | Agreed |
C3‑091079 | General definition and description for MBMS support in EPS | ZTE | Agreed |
C3‑091080 | Interworking with BM-SC in EPS | ZTE | Agreed |
C3‑091081 | General description of MBMS session start/update/stop procedure | ZTE | Revised in 1023 |
C3‑091082 | Message flows of SGmb interface | ZTE, Huawei | Revised in 1024 |
C3‑091083 | SGmb message | ZTE | Revised in 1025 |
C3‑091084 | SGmb specific AVPs | ZTE | Withdrawn |
C3‑091085 | SGmb re-used AVPs | ZTE | Revised in 1026 |
C3‑091086 | APN-AMBR in S9 | Ericsson | Agreed |
C3‑091087 | Resolve the conflict of event trigger descriptions | ZTE | Agreed |
C3‑091088 | Proposed Schedule for CT3#54 | CT3 Chairman | Revised in 1030 |
C3‑091089 | Error handling in authorized QoS enforcement | ZTE | Agreed |
C3‑091090 | Error handling in authorized QoS enforcement | ZTE | Agreed |
C3‑091091 | Handling of multiple BBERF | ZTE | Agreed |
C3‑091092 | IMS Emergency Services | Ericsson | Revised in 1139 |
C3‑091093 | Emergency services not supported in S9 | Ericsson | Revised in 1128 |
C3‑091094 | Clarification for the Gxx Gx linking | Huawei | Revised in 1126 |
C3‑091095 | Clarification for emergency services | Huawei | Agreed |
C3‑091096 | New WID on PCC | Huawei, Orange, Qualcomm Europe, ZTE, T-Mobile | Revised in 1130 |
C3‑091097 | Questionnaire for 3GPP Election Candidates | University of Pencilmania, School for ThreeGeePeePee Academic Rewards and Tests (UPSTART) | Noted |
C3‑091098 | Endorsement of ETSI TISPAN ES 283 012 | Thomas | Revised in 1103 |
C3‑091099 | Deletion of the note about the normalization of phone numbers | Orange | Revised in 1112 |
C3‑091100 | Usage Reporting in Gx | Ericsson | Postponed |
C3‑091101 | Handling of multiple BBERF in PCEF-Initiated IP-CAN session modification for visited access | ZTE | Revised in 1118 |
C3‑091102 | Codecs at the NNI | Nokia Siemens Networks | Revised in 1146 |
C3‑091103 | Endorsement of ETSI TISPAN ES 283 012 | Thomas | Revised in 1148 |
C3‑091104 | IMSI attach | Ericsson | Revised in 1149 |
C3‑091105 | Handling of RTCP Streams | Nokia Siemens Networks | Agreed |
C3‑091106 | Use of Media Information at TrGW not supporting transcoding | Nokia Siemens Networks | Revised in 1161 |
C3‑091107 | Notification of released bearer | Nokia Siemens Networks | Agreed |
C3‑091108 | Media Inactivity Detection | Nokia Siemens Networks | Postponed |
C3‑091109 | Media Inactivity Detection | Nokia Siemens Networks | Postponed |
C3‑091110 | Major capabilities on II-NNI | Telecom Italia, Orange | Revised in 1150 |
C3‑091111 | Requirements for the end-to-end interoperability of supplementary services | Orange, Vodafone, Telecom Italia | Revised in 1151 |
C3‑091112 | Deletion of the note about the normalization of phone numbers | Orange | Revised in 1152 |
C3‑091113 | MCID interaction at the NNI | Ericsson | Revised in 1145 |
C3‑091114 | Reply LS on LS on mapping access types | Ericsson | Approved |
C3‑091115 | Reply LS on 3GPP2 User location parameter availability in the P-GW for charging purpose | - | Revised in 1131 |
C3‑091116 | Deferred leg session linking handling | Ericsson | Agreed |
C3‑091117 | Handling of multiple BBERF about new gateway control session establishment for visited access | ZTE | Revised in 1132 |
C3‑091118 | Handling of multiple BBERF in PCEF-Initiated IP-CAN session modification for visited access | ZTE | Agreed |
C3‑091119 | Add the implementation of gateway control and QoS rules request for visited access | ZTE | Agreed |
C3‑091120 | General error-correction | ZTE | Agreed |
C3‑091121 | Modification of the S9 implementation of gateway control and QoS rules provision | ZTE | Agreed |
C3‑091122 | Modification of the S9 implementation of gateway control and QoS rules request | ZTE | Agreed |
C3‑091123 | Indication of QoS reservation result over Gx and Gxx | Ericsson | Agreed |
C3‑091124 | Limited PCC deployment | ZTE, Huawei | Agreed |
C3‑091125 | Trace (de)activation at P-GW | Nokia Siemens Networks | Revised in 1135 |
C3‑091126 | Clarification for the Gxx Gx linking | Huawei | Revised in 1136 |
C3‑091127 | 3GPP2-BSID over Gx | Alcatel-Lucent | Agreed |
C3‑091128 | Emergency services not supported in S9 | Ericsson | Agreed |
C3‑091129 | PCEF Handling of Emergency Call Back | Alcatel-Lucent | Revised in 1140 |
C3‑091130 | New WID on PCC | Huawei, Orange, Qualcomm Europe, ZTE, T-Mobile | Revised in 1141 |
C3‑091131 | Reply LS on 3GPP2 User location parameter availability in the P-GW for charging purpose | Alcatel Lucent | Approved |
C3‑091132 | Handling of multiple BBERF about new gateway control session establishment for visited access | ZTE | Agreed |
C3‑091133 | PCEF-initiated IP-CAN Session modification in Non-Roaming and Home-routed | ZTE | Postponed |
C3‑091134 | PCEF-initiated IP-CAN Session modification in visited access | ZTE | Postponed |
C3‑091135 | Trace (de)activation at P-GW | Nokia Siemens Networks | Agreed |
C3‑091136 | Clarification for the Gxx Gx linking | Huawei | Agreed |
C3‑091137 | Message flows of SGmb interface | ZTE, Huawei | Agreed |
C3‑091138 | SGmb message | ZTE | Agreed |
C3‑091139 | IMS Emergency Services | Ericsson, Huawei | Revised in 1154 |
C3‑091140 | PCEF Handling of Emergency Call Back | Alcatel-Lucent | Agreed |
C3‑091141 | New WID on PCC | Huawei, Orange, Qualcomm Europe, ZTE, T-Mobile | Agreed |
C3‑091142 | Reply LS Enhancements for Communication Waiting Supplementary Service | ALU | Revised in 1166 |
C3‑091143 | Reply LS on H.245 Flow Control Command | Thomas | Approved |
C3‑091144 | Request to 3GPP2 to Assign 3GPP2 Diameter AVP 3GPP2-BSID | Starent Networks Corporation, | Approved |
C3‑091145 | MCID interaction at the NNI | Ericsson | Agreed |
C3‑091146 | Codecs at the NNI | Nokia Siemens Networks | Agreed |
C3‑091147 | Supported-Features AVP handling in Gx | Ericsson | Revised in 1164 |
C3‑091148 | Endorsement of ETSI TISPAN ES 283 012 | Thomas | Approved |
C3‑091149 | IMSI attach | Ericsson | Revised in 1153 |
C3‑091150 | Major capabilities on II-NNI | Telecom Italia, Orange | Revised in 1155 |
C3‑091151 | Requirements for the end-to-end interoperability of supplementary services | Orange, Vodafone, Telecom Italia | Revised in 1156 |
C3‑091152 | Deletion of the note about the normalization of phone numbers | Orange | Agreed |
C3‑091153 | IMSI attach | Ericsson | Agreed |
C3‑091154 | IMS Emergency Services | Ericsson, Huawei | Agreed |
C3‑091155 | Major capabilities on II-NNI | Telecom Italia, Orange | Agreed |
C3‑091156 | Requirements for the end-to-end interoperability of supplementary services | Orange, Vodafone, Telecom Italia | Agreed |
C3‑091157 | New SID on PCRF Failure and Restoration | NEC, Bridgewater Systems, Telecom Italia, Huawei, NTT DOCOMO, NTT, Alcatel-Lucent | Agreed |
C3‑091158 | Scope for TR 29.8yz | NEC | Agreed |
C3‑091159 | Supporting multiple PDN connection to same APN | Huawei, ZTE | Agreed |
C3‑091160 | Supporting multiple PDN connection to same APN | Huawei | Agreed |
C3‑091161 | Use of Media Information at TrGW not supporting transcoding | Nokia Siemens Networks | Agreed |
C3‑091162 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V1) | Orange | Revised in 1165 |
C3‑091163 | Supporting multiple PDN connection to same APN | Huawei, ZTE | Agreed |
C3‑091164 | Supported-Features AVP handling in Gx | Ericsson | Agreed |
C3‑091165 | Management of SIP headers over II-NNI in presence of trust or no trusted relationship (V1) | Orange | Agreed |
C3‑091166 | Reply LS Enhancements for Communication Waiting Supplementary Service | ALU | Approved |
C3‑091167 | Status of CT3 work Items at CT3#54 | CT3 Chairman | Revised in 1168 |
C3‑091168 | Status of CT3 work Items at CT3#54 | CT3 Chairman | Agreed |
C3‑091169 | TR 29.8yz v0.1.0 | NEC | Agreed |
page generated from database: 2024-04-22 07:58:53